ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

42 coal blocks auctioned till date for commercial use: Centre
COAL & MINING

42 coal blocks auctioned till date for commercial use: Centre

A total of 42 coal mines had been auctioned for commercial mining till date, according to the administration.

According to a statement from the coal ministry, ten coal mines were auctioned this week under the third tranche of the said blocks.

A total of 42 coal mines, including mines auctioned in third tranche, have been successfully auctioned under the commercial coal mining auction procedure, with a total cumulative peak rate capacity (PRC) of 86.404 million tonnes per annum (mtpa), according to the announcement.

The ministry estimates that the 10 blocks sold this week will produce Rs 2,858.20 crore in yearly revenue.The ministry informed that the year income was predicted based on the mine's peak rate capacity.

Five blocks were sold on the first day of the auction.The top bidder for two coal blocks in Jharkhand was Dalmia Cement Bharat Ltd.

The Ministry of Coal informed in a statement on Tuesday that Mahanadi Mines and Minerals was the highest bidder for a coal block in Odisha, while Yazdani Steel And Power was the highest bidder for another coal mine in the eastern state.

The top bidder for a mining site in Assam was Assam Mineral Development Corp Ltd.

Jindal Steel and Power won the Utkal-C coal mine in Odisha on the second and third days of the auction, while Hindalco Industries won the Meenakshi mine in the eastern state.

The highest bidder for the Majra mine in Maharashtra was BS Ispat Ltd, while the Assam Mineral Development Corporation won the Garampani coal block in Assam.

Namchik Namphuk mine in Arunachal Pradesh was acquired by Platinum Alloys Pvt Ltd.


Also read: Dalmia Cement becomes highest bidder for Jharkhand's 2 coal blocks

A total of 42 coal mines had been auctioned for commercial mining till date, according to the administration. According to a statement from the coal ministry, ten coal mines were auctioned this week under the third tranche of the said blocks. A total of 42 coal mines, including mines auctioned in third tranche, have been successfully auctioned under the commercial coal mining auction procedure, with a total cumulative peak rate capacity (PRC) of 86.404 million tonnes per annum (mtpa), according to the announcement. The ministry estimates that the 10 blocks sold this week will produce Rs 2,858.20 crore in yearly revenue.The ministry informed that the year income was predicted based on the mine's peak rate capacity. Five blocks were sold on the first day of the auction.The top bidder for two coal blocks in Jharkhand was Dalmia Cement Bharat Ltd. The Ministry of Coal informed in a statement on Tuesday that Mahanadi Mines and Minerals was the highest bidder for a coal block in Odisha, while Yazdani Steel And Power was the highest bidder for another coal mine in the eastern state. The top bidder for a mining site in Assam was Assam Mineral Development Corp Ltd. Jindal Steel and Power won the Utkal-C coal mine in Odisha on the second and third days of the auction, while Hindalco Industries won the Meenakshi mine in the eastern state. The highest bidder for the Majra mine in Maharashtra was BS Ispat Ltd, while the Assam Mineral Development Corporation won the Garampani coal block in Assam. Namchik Namphuk mine in Arunachal Pradesh was acquired by Platinum Alloys Pvt Ltd. Image Source Also read: Dalmia Cement becomes highest bidder for Jharkhand's 2 coal blocks

Next Story
Infrastructure Transport

Dassault To Build Falcon Jets In India With Reliance

Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..

Next Story
Infrastructure Urban

INDEA Lays Foundation for India’s First Auto Design School

The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..

Next Story
Infrastructure Transport

Karnataka Launches Global Innovation Hub at Airport City

The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement