ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

 NTPC signs pact to install 325 MW solar power projects
POWER & RENEWABLE ENERGY

NTPC signs pact to install 325 MW solar power projects

National Thermal Power Corporation (NTPC) told the media that its arm NTPC Renewable Energy Limited (REL) had signed a Power Purchase Agreement (PPA) and other agreements with the Indian Railways, MP Power Management Company Ltd (MPPMCL) and Rewa Ultra Mega Solar Limited (RUMSL).

NTPC said that NTPC REL had signed a PPA with Indian Railways, MPPMCL and RUMSL for 325 MW solar power projects installed in RUMSL at Shajapur Solar Park in Madhya Pradesh.

This year on 25 November, the PPA was signed in the presence of the Chief Minister of Madhya Pradesh, Shivraj Singh Chauhan and Minister of Power and New and Renewable Energy (MNRE), R K Singh.

NTPC REL has won a capacity of 105 MW quoted Rs 2.35 per kWh, and 220 MW capacity quoted Rs 2.33 per kWh for 450 MW solar power projects at Shajapur Solar Park in Madhya Pradesh in RUMSL's auction, which was held on 19 July.

NTPC won six more bids for renewable energy capacity through competitive biddings. NTPC REL was floated to develop renewable energy projects.

National Thermal Power Corporation (NTPC) told the media that its arm NTPC Renewable Energy Limited (REL) had signed a Power Purchase Agreement (PPA) and other agreements with the Indian Railways, MP Power Management Company Ltd (MPPMCL) and Rewa Ultra Mega Solar Limited (RUMSL). NTPC said that NTPC REL had signed a PPA with Indian Railways, MPPMCL and RUMSL for 325 MW solar power projects installed in RUMSL at Shajapur Solar Park in Madhya Pradesh. This year on 25 November, the PPA was signed in the presence of the Chief Minister of Madhya Pradesh, Shivraj Singh Chauhan and Minister of Power and New and Renewable Energy (MNRE), R K Singh. NTPC REL has won a capacity of 105 MW quoted Rs 2.35 per kWh, and 220 MW capacity quoted Rs 2.33 per kWh for 450 MW solar power projects at Shajapur Solar Park in Madhya Pradesh in RUMSL's auction, which was held on 19 July. NTPC won six more bids for renewable energy capacity through competitive biddings. NTPC REL was floated to develop renewable energy projects. Image Source

Next Story
Infrastructure Transport

Air India Ends Full-Service Flights at Imphal Airport

Air India officially ceased its full-service operations at Imphal International Airport on 16 June 2025, marking the end of an era that spanned decades. The decision follows a strategic shift in route optimisation across the airline’s network. While the national carrier departs, its low-cost subsidiary, Air India Express, will gradually assume operations on routes previously served by the full-service airline, subject to market demand.Officials clarified that this move is unrelated to recent security incidents or technical faults affecting airlines. Instead, it forms part of a broader restru..

Next Story
Infrastructure Urban

Auto Sales Show Steady Growth in May 2025

India’s automobile sector demonstrated steady growth in May 2025, with total production and domestic sales showing modest gains across key segments.Overall vehicle production—including passenger, three‑wheelers, two‑wheelers, and quadricycles—reached 2.58 million units, marking a year‑on‑year rise of 5.2 per cent. Domestic sales across these categories totalled around 2.01 million units, up 1.8 per cent compared to May 2024.Passenger Vehicles (PVs)Passenger vehicle dispatches to dealers remained nearly flat at 344,656 units, reflecting a marginal decline of 0.8 per cent from the ..

Next Story
Infrastructure Urban

JLR Cuts FY26 EBIT Margin to 5�7% Amid US Tariff Pressure

Jaguar Land Rover (JLR), the UK‑based luxury carmaker owned by Tata Motors, has lowered its forecast for fiscal 2026 earnings before interest and taxes (EBIT) to 5�7 per cent, down from a target of 10 per cent, and compared with 8.5 per cent delivered in FY25. The revision is attributed to multiple pressures including anticipated increases in US tariffs on foreign‑built vehicles, shifts in product mix, and elevated capital expenditure.JLR also projects near‑zero free cash flow for FY26, signalling a tight financial outlook. The optimism for FY27, however, remains intact, with expectati..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement