APTEL Upholds Solar Project鈥檚 GST Compensation
12 Feb 2025
3 Min Read
CW Team
The Appellate Tribunal for Electricity (APTEL) has dismissed an appeal by the Hubli Electricity Supply Company (HESCOM), upholding the Karnataka Electricity Regulatory Commission's (KERC) 2021 order that granted a tariff increase for a solar project to offset the higher costs due to changes in tax laws.
APTEL affirmed KERC鈥檚 decision, allowing an incremental tariff hike of Rs 0.39 /kWh for 22 years, over the existing tariff of Rs 2.91/kWh. This adjustment ensures the recovery of Rs 217.5 million for the solar project.
Background
The Karnataka Renewable Energy Development Limited (KREDL) initiated a request for proposals to develop 1,200 MW of solar projects within the 2,000 MW Pavagada Solar Park. Adyah Solar Energy won the project and signed a power purchase agreement (PPA) with HESCOM on April 28, 2018, at a tariff of Rs 2.91 /kWh.
However, in July 2018, the Ministry of Finance introduced the Safeguard Duty (SGD) and Integrated Goods and Services Tax (IGST) on imported solar modules to protect domestic manufacturers.
Adyah Solar, which used imported modules, petitioned KERC, seeking to classify the SGD and IGST as a 鈥楥hange in Law鈥� event. The company claimed Rs 317.5 million in additional costs and requested a corresponding tariff increase.
In June 2021, KERC ruled in favour of Adyah Solar, recognising the imposition of SGD and IGST as a 鈥楥hange in Law鈥� event. KERC awarded Rs 217.5 million in reimbursement and approved a tariff increase of Rs 0.39 /kWh for 25 years.
HESCOM challenged the ruling, arguing that tariff determination under Section 62 of the Electricity Act should not apply, as the project's tariff was initially set via competitive bidding under Section 63.
Tribunal鈥檚 analysis
APTEL dismissed HESCOM鈥檚 appeal, affirming KERC鈥檚 legal authority under Section 86(1)(b) of the Electricity Act, which allows state commissions to regulate electricity procurement prices, including those affected by changes in the law. The Tribunal upheld KERC's decision, noting that neither the bidding guidelines nor the PPA included a provision to address changes in the law.
APTEL also rejected HESCOM鈥檚 claim that the compensation of Rs 673 million over 22 years was excessive compared to the initial claim of Rs 317.5 million. It stated that spreading the compensation over 22 years accounted for the time value of money, ensuring a fair recovery for Adyah Solar without placing undue burden on consumers.
In a recent ruling, APTEL also overturned a decision by the Jharkhand State Electricity Regulatory Commission that had granted Tata Steel an exemption from renewable purchase obligations.
(Mercom)
The Appellate Tribunal for Electricity (APTEL) has dismissed an appeal by the Hubli Electricity Supply Company (HESCOM), upholding the Karnataka Electricity Regulatory Commission's (KERC) 2021 order that granted a tariff increase for a solar project to offset the higher costs due to changes in tax laws. APTEL affirmed KERC鈥檚 decision, allowing an incremental tariff hike of Rs 0.39 /kWh for 22 years, over the existing tariff of Rs 2.91/kWh. This adjustment ensures the recovery of Rs 217.5 million for the solar project. Background The Karnataka Renewable Energy Development Limited (KREDL) initiated a request for proposals to develop 1,200 MW of solar projects within the 2,000 MW Pavagada Solar Park. Adyah Solar Energy won the project and signed a power purchase agreement (PPA) with HESCOM on April 28, 2018, at a tariff of Rs 2.91 /kWh. However, in July 2018, the Ministry of Finance introduced the Safeguard Duty (SGD) and Integrated Goods and Services Tax (IGST) on imported solar modules to protect domestic manufacturers. Adyah Solar, which used imported modules, petitioned KERC, seeking to classify the SGD and IGST as a 鈥楥hange in Law鈥� event. The company claimed Rs 317.5 million in additional costs and requested a corresponding tariff increase. In June 2021, KERC ruled in favour of Adyah Solar, recognising the imposition of SGD and IGST as a 鈥楥hange in Law鈥� event. KERC awarded Rs 217.5 million in reimbursement and approved a tariff increase of Rs 0.39 /kWh for 25 years. HESCOM challenged the ruling, arguing that tariff determination under Section 62 of the Electricity Act should not apply, as the project's tariff was initially set via competitive bidding under Section 63. Tribunal鈥檚 analysis APTEL dismissed HESCOM鈥檚 appeal, affirming KERC鈥檚 legal authority under Section 86(1)(b) of the Electricity Act, which allows state commissions to regulate electricity procurement prices, including those affected by changes in the law. The Tribunal upheld KERC's decision, noting that neither the bidding guidelines nor the PPA included a provision to address changes in the law. APTEL also rejected HESCOM鈥檚 claim that the compensation of Rs 673 million over 22 years was excessive compared to the initial claim of Rs 317.5 million. It stated that spreading the compensation over 22 years accounted for the time value of money, ensuring a fair recovery for Adyah Solar without placing undue burden on consumers. In a recent ruling, APTEL also overturned a decision by the Jharkhand State Electricity Regulatory Commission that had granted Tata Steel an exemption from renewable purchase obligations. (Mercom)
Next Story
Lack of Bidders Stalls VOC Port鈥檚 Rs 70.56 Bn Harbour Project Again
The VOC Port Authority鈥檚 Rs 70.56 billion outer harbour project has once again faced a setback, with the latest tender process cancelled due to the absence of qualified bidders. This marks the second failed attempt to secure participation for the mega infrastructure initiative.The tender has reportedly been withdrawn from the active list of bids, and the authority is now expected to re-evaluate and possibly restructure the project to enhance its appeal to potential developers.The port authority had initially floated the Request for Proposal (RFP) in December 2024, following the cancellation ..
Next Story
Sea Lord Containers Opens Cryogenic LPG Terminal in Mangalore
Sea Lord Containers (SCL), a wholly-owned subsidiary of Aegis Logistics, has commissioned a new cryogenic Liquified Petroleum Gas (LPG) terminal in Mangalore. The facility, which became operational on 12 June 2025, offers a static storage capacity of 82,000 metric tons (MT), significantly strengthening the region鈥檚 LPG logistics infrastructure.The terminal was developed by SCL on behalf of Aegis Vopak Terminals, an associate company of Aegis Logistics. The asset is expected to be transferred to Aegis Vopak Terminals Limited at a later date, with formal updates to be shared separately with st..
Next Story
Cochin Port and Oil India Partner for Offshore Exploration Support
The Cochin Port Authority (CoPA) has signed a Memorandum of Understanding (MoU) with Oil India (OIL) to establish a shore base facility supporting offshore oil exploration in the Kerala-Konkan Basin. The agreement was formalised at a ceremony held at CoPA, Willingdon Island, on 12 June 2025, in the presence of senior officials from both organisations.Under the partnership, Cochin Port will provide critical logistics infrastructure for OIL鈥檚 offshore drilling operations, expected to begin later in 2025. The planned shore base will include a dedicated warehouse, dry bulk handling plant, and an..