ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

ONGC to develop India’s first geothermal plant
POWER & RENEWABLE ENERGY

ONGC to develop India’s first geothermal plant

Oil and Natural Gas Corporation (ONGC) has signed a memorandum of understanding (MoU) with the Union Territory (UT) of Ladakh and Ladakh Autonomous Hill Development Council (LAHDC), Leh, to develop India's first geothermal field development project.

ONGC told media sources that the MoU has been signed as a step towards creating a carbon-neutral Ladakh.

The firm said geothermal resource development could revolutionise farming in Ladakh, which is currently dependent for supply of fresh vegetables, fruits from outside the UT, round the year.

ONGC has planned this field development in Ladakh in three phases.

Phase one involves exploratory-cum-production drilling of wells, up to 500 m deep and setting up a pilot plant of up to 1 MW power capacity.

Phase two would involve a deeper and lateral exploration of a geothermal reservoir by drilling an optimal number of wells and setting up a higher capacity demo plant and preparing a Detailed Project Report.

Phase three would involve commercial development of the geothermal plant.

ONGC said that Puga and Chumathang in Eastern Ladakh, discovered in the 1970s, happens to be the most promising geothermal fields in India.


Make in Steel 2021

24 February 


4th Indian Cement Review Conference 2021

17-18 March 


What are geothermal fields?

Geothermal fields develop when water from the earth's surface is able to seep through faults and cracks within rocks, sometimes to depths of several kilometres, to reach hot regions within the crust. When the water is heated, it rises back naturally towards the surface by the process of convection and may appear there again in the form of geysers, hot springs, fumaroles or hot mud holes. These are common along tectonic plate boundaries.

Geothermal fields are usually developed in stages. During the preliminary stage, at least one single-flash unit is built and operated. During the later stage, a double-flash unit is integrated with the single-flash unit. The integration occurs through the use of the separated liquid from the single-flash unit as the source of low-pressure flash steam (at two pressure levels) for the double-flash unit. The double-flash unit's addition raises the thermodynamic utilisation efficiency of the entire plant since more power is generated with the same amount of geofluid.

There are seven geothermal provinces in India: the Himalayas, Sohana, West coast, Cambay, Son-Narmada-Tapi basins, Godavari, and Mahanadi.

: Geothermal resource development could revolutionise farming in Ladakh. (Representational image only.)


Also read: Hydropower projects on Indus, Ladakh cleared

Oil and Natural Gas Corporation (ONGC) has signed a memorandum of understanding (MoU) with the Union Territory (UT) of Ladakh and Ladakh Autonomous Hill Development Council (LAHDC), Leh, to develop India's first geothermal field development project. ONGC told media sources that the MoU has been signed as a step towards creating a carbon-neutral Ladakh. The firm said geothermal resource development could revolutionise farming in Ladakh, which is currently dependent for supply of fresh vegetables, fruits from outside the UT, round the year. ONGC has planned this field development in Ladakh in three phases. Phase one involves exploratory-cum-production drilling of wells, up to 500 m deep and setting up a pilot plant of up to 1 MW power capacity. Phase two would involve a deeper and lateral exploration of a geothermal reservoir by drilling an optimal number of wells and setting up a higher capacity demo plant and preparing a Detailed Project Report. Phase three would involve commercial development of the geothermal plant. ONGC said that Puga and Chumathang in Eastern Ladakh, discovered in the 1970s, happens to be the most promising geothermal fields in India.Make in Steel 202124 February Click for event info4th Indian Cement Review Conference 202117-18 March Click for event info What are geothermal fields? Geothermal fields develop when water from the earth's surface is able to seep through faults and cracks within rocks, sometimes to depths of several kilometres, to reach hot regions within the crust. When the water is heated, it rises back naturally towards the surface by the process of convection and may appear there again in the form of geysers, hot springs, fumaroles or hot mud holes. These are common along tectonic plate boundaries. Geothermal fields are usually developed in stages. During the preliminary stage, at least one single-flash unit is built and operated. During the later stage, a double-flash unit is integrated with the single-flash unit. The integration occurs through the use of the separated liquid from the single-flash unit as the source of low-pressure flash steam (at two pressure levels) for the double-flash unit. The double-flash unit's addition raises the thermodynamic utilisation efficiency of the entire plant since more power is generated with the same amount of geofluid. There are seven geothermal provinces in India: the Himalayas, Sohana, West coast, Cambay, Son-Narmada-Tapi basins, Godavari, and Mahanadi. Image: Geothermal resource development could revolutionise farming in Ladakh. (Representational image only.)Also read: Hydropower projects on Indus, Ladakh cleared

Next Story
Infrastructure Transport

DGCA Reviews Safety and Delays at Air India, Express

The Directorate General of Civil Aviation (DGCA) conducted a detailed review meeting on 17 June 2025 with the senior management of Air India Limited and Air India Express. The move came in response to a series of flight delays and passenger complaints, with the regulator focusing on improving safety, operational performance, and customer service.Together, the two airlines operate more than 1,000 daily flights across India and abroad. The DGCA highlighted that several of the delays were maintenance-related and called for improved coordination between engineering, operations, and ground handling..

Next Story
Infrastructure Transport

Nitish Kumar Inaugurates Key NH-22 Road in Bihar

Bihar Chief Minister Nitish Kumar on Monday inaugurated the Bhupatipur–Punpun section of the Mithapur–Mahuli–Punpun corridor, part of National Highway 22. The new road link, constructed by infrastructure major Afcons Infrastructure Ltd, drastically reduces travel time from nearly one hour to just ten minutes, benefiting hundreds of thousands of daily commuters in the region.The completed section comprises a 5-kilometre elevated four-lane corridor, 10 kilometres of at-grade four-lane road, and a 1-kilometre ramp, all designed to support travel speeds of up to 100 km/h, enhancing both spee..

Next Story
Infrastructure Urban

UGRO Acquires Profectus to Boost MSME Lending and Profits

UGRO Capital Limited, a leading DataTech non-banking financial company (NBFC) focused on MSME financing, has signed an agreement to acquire 100 per cent equity in Profectus Capital Private Limited, a secured lending-focused NBFC, in an all-cash deal funded from UGRO’s recent equity raise. This strategic acquisition makes Profectus a wholly owned subsidiary and is expected to contribute approximately Rs 1.5 billion (USD 18 million) in annualised profit to UGRO, with Rs 1.15 billion in cost savings, thereby enhancing capital adequacy and return on assets by 60�70 basis points post-merger.The..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement