亚博体育官网首页

Search Result

   Back to home
1 - 10 Results of 136

Patna to Get Rs 950 Mn World-Class Rail Terminal in 18 Months

The foundation stone for the project was laid virtually by Prime Minister Narendra Modi during his two-day visit to Bihar.


Metro Line 8 to Link Mumbai's Twin Airports with Fast Connectivity

Authorities involved in infrastructure planning have indicated that the project is slated for commissioning by 2029.


Metro Line 8 DPR Nears Completion; CIDCO to Float Rs 200 Bn Tenders

With a projected daily ridership of 9 lakh, Metro Line 8 is expected to alleviate traffic on congested routes such as the Eastern Express and Sion-Panvel Highways.


Mumbai Metro Tunnel Boring Machine Disha Completes Breakthrough

Disha completes tunnelling at Airport Colony Station for Line Seven A


Mumbai Metro Breakthrough on Line 7A Tunnel to Airport

Andheri East鈥揂irport tunnel milestone brings metro link closer


Mumbai Completes Construction of Underground Metro Tunnel

This achievement is both a technical and environmental milestone, contributing to climate-friendly urban mobility.


PMRDA may delay launch of Hinjewadi-Shivajinagar Metro route

As of now, around 85 per cent of the work has been completed, and the remaining infrastructure needed to begin testing will be ready by December.


Mumbai Flight Fares Set to Rise

International passengers will see their UDF rise from Rs 187 to Rs 650, while domestic passengers, who previously did not pay this fee.


Maharashtra Plans Third Airport in MMR Near Palghar

This project is part of a broader plan to create a new city.


Metro 8: Mumbai-Navi Mumbai Airport Link Cleared

35-km Gold Line to Boost Connectivity


Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"