ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

‘Sudarshan’ bores 1.5-km tunnel for Delhi-Meerut RRTS
ROADS & HIGHWAYS

‘Sudarshan� bores 1.5-km tunnel for Delhi-Meerut RRTS

The tunnelling work for the country's first Regional Rapid Transit System (RRTS) has moved into the next phase with the construction of a tunnel of around 1.5 km length from Anand Vihar to New Ashok Nagar, according to an official statement.

The National Capital Region Transport Corporation (NCRTC) is implementing India's first Regional Rapid Transit System between Delhi and Meerut. The Delhi-Ghaziabad-Meerut corridor is 82 km long, of which 14 km is in Delhi. The Delhi section has four stations: Jangpura, Sarai Kale Khan, New Ashok Nagar and Anand Vihar, with only the Anand Vihar station being underground.

Two 'Sudarshan' tunnel boring machines are in operation to construct two three-km-long parallel tunnels from Anand Vihar station to New Ashok Nagar. The first Sudarshan 4.1 has already bored 1.5 km tunnel, while the second Sudarshan 4.2 has also constructed about 1km of tunnel so far.

To retrieve these Sudarshan machines after the completion of the construction of the tunnels, a retrieving shaft has been built near the New Ashok Nagar station, from where the corridor gets elevated.

The tunnel segments are being manufactured at NCRTC's casting yard. Due to the large rolling stock and a high design speed of 180 mph, the width of RRTS tunnels is being constructed as 6.5 metre diameter, the statement said.

See also:
TBMs to begin working on Chennai Metro Phase II in Oct
PMC, MahaMetro hold review of DPR for Pune Metro Phase 2


The tunnelling work for the country's first Regional Rapid Transit System (RRTS) has moved into the next phase with the construction of a tunnel of around 1.5 km length from Anand Vihar to New Ashok Nagar, according to an official statement. The National Capital Region Transport Corporation (NCRTC) is implementing India's first Regional Rapid Transit System between Delhi and Meerut. The Delhi-Ghaziabad-Meerut corridor is 82 km long, of which 14 km is in Delhi. The Delhi section has four stations: Jangpura, Sarai Kale Khan, New Ashok Nagar and Anand Vihar, with only the Anand Vihar station being underground. Two 'Sudarshan' tunnel boring machines are in operation to construct two three-km-long parallel tunnels from Anand Vihar station to New Ashok Nagar. The first Sudarshan 4.1 has already bored 1.5 km tunnel, while the second Sudarshan 4.2 has also constructed about 1km of tunnel so far. To retrieve these Sudarshan machines after the completion of the construction of the tunnels, a retrieving shaft has been built near the New Ashok Nagar station, from where the corridor gets elevated. The tunnel segments are being manufactured at NCRTC's casting yard. Due to the large rolling stock and a high design speed of 180 mph, the width of RRTS tunnels is being constructed as 6.5 metre diameter, the statement said. See also: TBMs to begin working on Chennai Metro Phase II in OctPMC, MahaMetro hold review of DPR for Pune Metro Phase 2

Next Story
Infrastructure Transport

Dassault To Build Falcon Jets In India With Reliance

Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..

Next Story
Infrastructure Urban

INDEA Lays Foundation for India’s First Auto Design School

The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..

Next Story
Infrastructure Transport

Karnataka Launches Global Innovation Hub at Airport City

The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement