3 firms in fray to develop Kalyan-Taloja metro line
02 Feb 2024
1 Min Read
CW Team
The Mumbai Metropolitan Region Development Authority (MMRDA) is likely to choose from three firms for the civil construction work of much-awaited Metro Line 12.
The firms that have submitted their bids for the project are Gawar Constructions, J Kumar Infraprojects and Welspun Enterprises.
The Metro Line 12, which will run between Kalyan and Taloja, is a 20-km-long fully elevated metro corridor with 19 stations.
The stations covered are Klayan, APMC Kalyan, Ganesh Nagar, Pisavali Gaon, Golavali, Dombivali MIDC, Sagaon, Sonarpada, Manpada, , Hedutane, Kolegaon, Nilje Gaon, Vadavali, Bale, Vaklan, Turbhe, Pisarve Depot, Pisarve, and Amandoot (Taloja).
It was in December 2023 that the MMRDA had invited tenders worth Rs 1,877 crore for part-design and construction of the elevated viaduct and 19 stations, with a completion time of 30 months.
As part of plan to create an inter-connected network, the Kalyan Taloja Metro Line 12 is set to feature interchange stations with Metro Line 5 at APMC Kalyan, as well as with Navi Mumbai Metro Line 01 at Taloja.
The Rs 8,416 crore Metro Line-5, spanning 24.9 kilometres and linking Thane to Kalyan through Bhiwandi, comprises a 15-station elevated corridor. Presently under construction, it is anticipated to commence commercial operations by 2025.
The Mumbai Metropolitan Region Development Authority (MMRDA) is likely to choose from three firms for the civil construction work of much-awaited Metro Line 12.
The firms that have submitted their bids for the project are Gawar Constructions, J Kumar Infraprojects and Welspun Enterprises.
The Metro Line 12, which will run between Kalyan and Taloja, is a 20-km-long fully elevated metro corridor with 19 stations.
The stations covered are Klayan, APMC Kalyan, Ganesh Nagar, Pisavali Gaon, Golavali, Dombivali MIDC, Sagaon, Sonarpada, Manpada, , Hedutane, Kolegaon, Nilje Gaon, Vadavali, Bale, Vaklan, Turbhe, Pisarve Depot, Pisarve, and Amandoot (Taloja).
It was in December 2023 that the MMRDA had invited tenders worth Rs 1,877 crore for part-design and construction of the elevated viaduct and 19 stations, with a completion time of 30 months.
As part of plan to create an inter-connected network, the Kalyan Taloja Metro Line 12 is set to feature interchange stations with Metro Line 5 at APMC Kalyan, as well as with Navi Mumbai Metro Line 01 at Taloja.
The Rs 8,416 crore Metro Line-5, spanning 24.9 kilometres and linking Thane to Kalyan through Bhiwandi, comprises a 15-station elevated corridor. Presently under construction, it is anticipated to commence commercial operations by 2025.
Next Story
Dassault To Build Falcon Jets In India With Reliance
Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..
Next Story
INDEA Lays Foundation for India’s First Auto Design School
The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..
Next Story
Karnataka Launches Global Innovation Hub at Airport City
The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..