亚博体育官网首页

Bidders Compete for Bengaluru Suburban Rail鈥檚 Head-Hardened Rails Bid
RAILWAYS & METRO RAIL

Bidders Compete for Bengaluru Suburban Rail鈥檚 Head-Hardened Rails Bid

Karnataka鈥檚 Rail Infrastructure Development Company (K-RIDE) has received bids from three firms for the supply of 19,000 MT of head-hardened rails for the 149.35 km Bengaluru Suburban Rail Project. The technical bids were opened on February 2, 2025. 

The special tracks will be deployed along the 23.86 km Corridor 2 (Mallige Line) from Baiyyappanahalli to Chikkabanavara and the 46.88 km Corridor 4 (Kanaka Line) from Heelalige to Rajanukunte. The 60E1 鈥� 1080 grade rails, manufactured as per Indian Railway Specification T-12-2009, undergo a special heat treatment to enhance strength, reduce residual stress, and extend track life. 

Bidders for the contract: 
  • ArcelorMittal Espana S.A 
  • Mitsui & Co., Ltd. 
  • Saarstahl Rail 
K-RIDE had floated the tender in September 2024 with an estimated cost of Rs 1.35 billion and a one-year completion timeline. Surprisingly, Jindal Steel & Power Ltd. (JSPL), the only Indian firm capable of competing, did not submit a bid. 

With the technical evaluation now underway, the financial bids of qualified firms will be opened in the coming months to determine the lowest bidder and most likely supplier.
This is the third track-related contract for the project to reach this stage.
Previous contracts included: 
  • Corridor 2鈥檚 ballastless/ballasted track work (Benniganahalli to Chikkabanavara, including Soladevanahalli Depot).
  • Supply of 2,250 MT 60E1 880 Grade Rails, where JSPL was the sole bidder in November 2024. 
(themetrorailguy)         

Karnataka鈥檚 Rail Infrastructure Development Company (K-RIDE) has received bids from three firms for the supply of 19,000 MT of head-hardened rails for the 149.35 km Bengaluru Suburban Rail Project. The technical bids were opened on February 2, 2025. The special tracks will be deployed along the 23.86 km Corridor 2 (Mallige Line) from Baiyyappanahalli to Chikkabanavara and the 46.88 km Corridor 4 (Kanaka Line) from Heelalige to Rajanukunte. The 60E1 鈥� 1080 grade rails, manufactured as per Indian Railway Specification T-12-2009, undergo a special heat treatment to enhance strength, reduce residual stress, and extend track life. Bidders for the contract: ArcelorMittal Espana S.A Mitsui & Co., Ltd. Saarstahl Rail K-RIDE had floated the tender in September 2024 with an estimated cost of Rs 1.35 billion and a one-year completion timeline. Surprisingly, Jindal Steel & Power Ltd. (JSPL), the only Indian firm capable of competing, did not submit a bid. With the technical evaluation now underway, the financial bids of qualified firms will be opened in the coming months to determine the lowest bidder and most likely supplier.This is the third track-related contract for the project to reach this stage.Previous contracts included: Corridor 2鈥檚 ballastless/ballasted track work (Benniganahalli to Chikkabanavara, including Soladevanahalli Depot).Supply of 2,250 MT 60E1 880 Grade Rails, where JSPL was the sole bidder in November 2024. (themetrorailguy)         

Next Story
Infrastructure Urban

Reliance, Diehl Advance Pact for Precision-Guided Munitions

Diehl Defence CEO Helmut Rauch and Reliance Group鈥檚 Founder Chairman Anil D. Ambani have held discussions to advance their ongoing strategic partnership focused on Guided and Terminally Guided Munitions (TGM), under a cooperation agreement originally signed in 2019.This collaboration underscores Diehl Defence鈥檚 long-term commitment to the Indian market and its support for the Indian Government鈥檚 Make in India initiative. The partnership鈥檚 current emphasis is on the urgent supply of the Vulcano 155mm Precision Guided Munition system to the Indian Armed Forces.Simultaneously, the 鈥淰ulc..

Next Story
Infrastructure Urban

Modis Navnirman to Migrate to Main Board, Merge Subsidiary

Modis Navnirman Limited has announced that its Board of Directors has approved a key strategic initiative involving migration from the BSE SME platform to the Main Board of both BSE and NSE, alongside a merger with its wholly owned subsidiary, Shree Modis Navnirman Private Limited.The move to the main boards marks a major milestone in the company鈥檚 growth trajectory, reflecting its consistent financial performance, robust corporate governance, and long-term commitment to value creation. This transition will grant the company access to a broader investor base, improve market participation, en..

Next Story
Infrastructure Urban

Global Capital Flows Remain Subdued, EMEA Leads in Q1 2025

The Bharat InvITs Association鈥檚 industry update for Q1 2025 shows subdued global capital flows, with investment volumes remaining at the lower end of the five-year range despite a late 2024 recovery. According to data from Colliers and MSCI Real Capital Analytics, activity in North America declined slightly, while EMEA maintained steady levels and emerged as the top region for investment in standing assets.The EMEA region now hosts seven of the top ten cross-border capital destinations for standing assets, pushing the United States鈥� share of global activity below 15 per cent. Meanwhile, in..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement