ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

Govt to ask 79 coal-based power plants to set up anti-emission gear
COAL & MINING

Govt to ask 79 coal-based power plants to set up anti-emission gear

The centre has asked 79 coal-based power plants totalling 20,500-MW near million-plus cities in 10 states comprising Tamil Nadu, Gujarat, Andhra Pradesh and UP to set up equipment to restrict the emission of poisonous sulphur dioxide and nitrogen dioxide gases, by end of December, while 517 others have been given timeline relaxations.

As per the updated categorisation of thermal power plants by the Central Pollution Control Board (CPCB), these 79 coal-fired power plants are near populated and already polluted cities. Chennai, Delhi, Greater Mumbai, Kota, Nagpur, Visakhapatnam and Vijayawada have been marked in the Category-A of the new standards.

The projects are held by Torrent Power, NTPC, Apraava India, Tata Power and state producing firms of Haryana, Rajasthan, Maharashtra and Tamil Nadu.

Projects falling in this category that fails to complete the work within the timeline will have to pay a penalty of 10 paise per unit of electricity produced up to 180 days of non-compliance, 15 paise between 181 days to 365 days and 20 paise per unit after 366 days, according to the notification released by the environment ministry in April 2021.


Also read: Govt starts fourth phase of commercial coal mining auction

The centre has asked 79 coal-based power plants totalling 20,500-MW near million-plus cities in 10 states comprising Tamil Nadu, Gujarat, Andhra Pradesh and UP to set up equipment to restrict the emission of poisonous sulphur dioxide and nitrogen dioxide gases, by end of December, while 517 others have been given timeline relaxations. As per the updated categorisation of thermal power plants by the Central Pollution Control Board (CPCB), these 79 coal-fired power plants are near populated and already polluted cities. Chennai, Delhi, Greater Mumbai, Kota, Nagpur, Visakhapatnam and Vijayawada have been marked in the Category-A of the new standards. The projects are held by Torrent Power, NTPC, Apraava India, Tata Power and state producing firms of Haryana, Rajasthan, Maharashtra and Tamil Nadu. Projects falling in this category that fails to complete the work within the timeline will have to pay a penalty of 10 paise per unit of electricity produced up to 180 days of non-compliance, 15 paise between 181 days to 365 days and 20 paise per unit after 366 days, according to the notification released by the environment ministry in April 2021. Image Source Also read: Govt starts fourth phase of commercial coal mining auction

Next Story
Resources

Hitachi Vantara Named Leader in GigaOm Radar for AI-Optimised Storage

Hitachi Vantara, the data infrastructure and hybrid cloud subsidiary of Hitachi Ltd. (TSE: 6501), has been recognised as both a Leader and Fast Mover in the 2025 GigaOm Radar for High-Performance Storage Optimised for AI Workloads. This marks the debut edition of the GigaOm report in this category, spotlighting the company’s ability to deliver enterprise-ready infrastructure solutions that support the growing demands of AI and machine learning workloads. The GigaOm Radar evaluates vendors based on current capabilities and future-readiness, focusing on performance, innovation, and execut..

Next Story
Real Estate

Hindware Introduces Portable Bidet for On-the-Go Hygiene

Hindware Italian Collection has introduced its Portable Battery-Operated Bidet, a compact hygiene solution tailored for the needs of modern users who are constantly on the move. Designed for travellers, new mothers, post-surgical care patients, and individuals with limited mobility, the device brings ease and comfort without compromise. The bidet features an advanced one-touch battery operation, eliminating the need for manual pumping. Its 180-degree adjustable nozzle ensures precise and comfortable use across different postures and settings. Key highlights include: Dual spray m..

Next Story
Real Estate

Asian Paints Unveils Apcolite All Protek with Lotus Effect Tech

Inspired by the natural self-cleaning properties of the lotus leaf, the Lotus Effect Technology creates a protective layer that repels everyday stains â€� from coffee and sauces to crayons â€� before they settle. Apcolite All Protek is available in Matt and Shyne finishes and carries a 6-year performance warranty, combining function with long-term care. It also features a refreshing fragrance, enhancing the user experience. â€œAt Asian Paints, we spend a lot of time understanding how homes are evolving, and our innovations reflect what today’s consumers truly need from their spaces. Tod..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement