ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

NTPC's Talaipalli Coal Mining project starts commercial operations
COAL & MINING

NTPC's Talaipalli Coal Mining project starts commercial operations

NTPC, the power giant, announced the commencement of commercial operations at the Talaipalli coal mining project in Chhattisgarh's Raigarh district. Situated in the Mand-Raigarh Coalfields near Talaipalli village in the Gahrghoda block of Raigarh district, the Talaipalli coal mine is a combination of open-pit and underground mining. The Ministry of Mines allocated the Talaipalli coal block to NTPC for developing a captive coal mine to supply its Lara Super Thermal Power Plant, located 65 km away in the same district.

NTPC stated in a regulatory filing, "We wish to inform that based on achievement of approved norms and due approvals, Talaipalli Coal Mining Project is declared on commercial operation with effect from 00:00 hours of 01.10.2023."

This coal block contains estimated mineable reserves of around 843.68 million tonnes (Mt). The project aims to produce up to 18.72 million tonnes per annum (Mtpa) of coal over an expected mine life of 52 years.

Initial mining operations at Talaipalli began in October 2019, resulting in a production of only 0.25Mt of coal as of July 2020.

The Talaipalli coal mine will employ open-cut mining initially, transitioning to underground mining after 20 years of operation. The open-cut operation is anticipated to yield 18 Mtpa, while underground operations will produce approximately 0.72 Mtpa.

In November of the previous year, NTPC dispatched the first coal rake from the captive Talaipalli coal mines to the Lara Super Thermal Power Project in Chhattisgarh.

NTPC, the power giant, announced the commencement of commercial operations at the Talaipalli coal mining project in Chhattisgarh's Raigarh district. Situated in the Mand-Raigarh Coalfields near Talaipalli village in the Gahrghoda block of Raigarh district, the Talaipalli coal mine is a combination of open-pit and underground mining. The Ministry of Mines allocated the Talaipalli coal block to NTPC for developing a captive coal mine to supply its Lara Super Thermal Power Plant, located 65 km away in the same district. NTPC stated in a regulatory filing, We wish to inform that based on achievement of approved norms and due approvals, Talaipalli Coal Mining Project is declared on commercial operation with effect from 00:00 hours of 01.10.2023. This coal block contains estimated mineable reserves of around 843.68 million tonnes (Mt). The project aims to produce up to 18.72 million tonnes per annum (Mtpa) of coal over an expected mine life of 52 years. Initial mining operations at Talaipalli began in October 2019, resulting in a production of only 0.25Mt of coal as of July 2020. The Talaipalli coal mine will employ open-cut mining initially, transitioning to underground mining after 20 years of operation. The open-cut operation is anticipated to yield 18 Mtpa, while underground operations will produce approximately 0.72 Mtpa. In November of the previous year, NTPC dispatched the first coal rake from the captive Talaipalli coal mines to the Lara Super Thermal Power Project in Chhattisgarh.

Next Story
Infrastructure Urban

DPIIT Partners With YourStory To Boost Inclusive Startups

In a significant step to boost grassroots entrepreneurship, the Department for Promotion of Industry and Internal Trade (DPIIT) has signed a Memorandum of Understanding (MoU) with YourStory Media Pvt Ltd, a private digital platform focused on startups, innovation, and entrepreneurship.The collaboration aligns with DPIIT’s objective of promoting inclusive startup growth across Tier II, Tier III, and rural regions of India. Under the Bharat Project, the initiative aims to empower one million entrepreneurs through the use of AI-driven tools, venture launchpads, and regional language storytellin..

Next Story
Resources

Hitachi Vantara Named Leader in GigaOm Radar for AI-Optimised Storage

Hitachi Vantara, the data infrastructure and hybrid cloud subsidiary of Hitachi Ltd. (TSE: 6501), has been recognised as both a Leader and Fast Mover in the 2025 GigaOm Radar for High-Performance Storage Optimised for AI Workloads. This marks the debut edition of the GigaOm report in this category, spotlighting the company’s ability to deliver enterprise-ready infrastructure solutions that support the growing demands of AI and machine learning workloads. The GigaOm Radar evaluates vendors based on current capabilities and future-readiness, focusing on performance, innovation, and execut..

Next Story
Real Estate

Hindware Introduces Portable Bidet for On-the-Go Hygiene

Hindware Italian Collection has introduced its Portable Battery-Operated Bidet, a compact hygiene solution tailored for the needs of modern users who are constantly on the move. Designed for travellers, new mothers, post-surgical care patients, and individuals with limited mobility, the device brings ease and comfort without compromise. The bidet features an advanced one-touch battery operation, eliminating the need for manual pumping. Its 180-degree adjustable nozzle ensures precise and comfortable use across different postures and settings. Key highlights include: Dual spray m..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement