Centre May Rebid Gensol Green Contracts Amid Fraud Probe
24 Apr 2025
3 Min Read
CW Team
The Central government is reviewing all green energy contracts awarded to Gensol Engineering Pvt. Ltd, raising the possibility of rebidding several high-value projects, sources told Mint. The review follows regulatory action against the company over alleged financial misconduct and concerns about its ability to deliver ongoing renewable energy contracts.
At the heart of the scrutiny is Gensol鈥檚 unexecuted order book worth approximately Rs 700 billion which includes major solar EPC (engineering, procurement and construction) and battery energy storage system (BESS) projects awarded by public sector giants like NTPC Ltd, Damodar Valley Corporation, and Singareni Collieries Company Ltd.
The review has been prompted by a 15 April interim order from the Securities and Exchange Board of India (SEBI), which barred Gensol and its promoters鈥擜nmol Singh Jaggi and Puneet Singh Jaggi鈥攆rom the securities market. SEBI accused the firm of fund diversion and forging documents, casting doubts over its operational integrity.
鈥淭he Centre is looking into the Gensol issue and every aspect of it, including the renewable EPC projects awarded by PSUs,鈥� a government official was quoted as saying. The Ministry of New and Renewable Energy (MNRE), which oversees the Indian Renewable Energy Development Agency (IREDA), is keeping a close watch and may recommend rebidding the contracts if Gensol fails to demonstrate capacity for completion.
Another driving factor behind the government鈥檚 intervention is to protect over Rs 10 billion in outstanding loans to Gensol. IREDA and Power Finance Corporation (PFC) have reportedly lent Rs 6.63 billion and Rs 3.5 billion, respectively. The Ministry of Power, which supervises PFC, is also involved in reviewing the case.
PFC filed a complaint with the Economic Offences Wing (EOW) of the Delhi Police, alleging that Gensol submitted forged documents. PFC has initiated an internal investigation and is evaluating legal and regulatory action against the company.
SEBI鈥檚 findings suggest that the misappropriated funds were primarily used to purchase electric vehicles for leasing to a related entity. However, the broader implications threaten India鈥檚 renewable energy deployment, particularly the execution of capital-intensive EPC contracts that demand financial discipline and credibility.
According to Gensol鈥檚 latest investor update for the December quarter of FY25, the firm had a pending order book of Rs 700 billion, with Rs 292.8 billion worth of solar EPC projects booked in just the third quarter.
If rebidding occurs, it could delay multiple green energy deployments and lead to disruptions in India鈥檚 clean energy targets, already under pressure due to financing and execution challenges in the sector.
The Central government is reviewing all green energy contracts awarded to Gensol Engineering Pvt. Ltd, raising the possibility of rebidding several high-value projects, sources told Mint. The review follows regulatory action against the company over alleged financial misconduct and concerns about its ability to deliver ongoing renewable energy contracts.
At the heart of the scrutiny is Gensol鈥檚 unexecuted order book worth approximately Rs 700 billion which includes major solar EPC (engineering, procurement and construction) and battery energy storage system (BESS) projects awarded by public sector giants like NTPC Ltd, Damodar Valley Corporation, and Singareni Collieries Company Ltd.
The review has been prompted by a 15 April interim order from the Securities and Exchange Board of India (SEBI), which barred Gensol and its promoters鈥擜nmol Singh Jaggi and Puneet Singh Jaggi鈥攆rom the securities market. SEBI accused the firm of fund diversion and forging documents, casting doubts over its operational integrity.
鈥淭he Centre is looking into the Gensol issue and every aspect of it, including the renewable EPC projects awarded by PSUs,鈥� a government official was quoted as saying. The Ministry of New and Renewable Energy (MNRE), which oversees the Indian Renewable Energy Development Agency (IREDA), is keeping a close watch and may recommend rebidding the contracts if Gensol fails to demonstrate capacity for completion.
Another driving factor behind the government鈥檚 intervention is to protect over Rs 10 billion in outstanding loans to Gensol. IREDA and Power Finance Corporation (PFC) have reportedly lent Rs 6.63 billion and Rs 3.5 billion, respectively. The Ministry of Power, which supervises PFC, is also involved in reviewing the case.
PFC filed a complaint with the Economic Offences Wing (EOW) of the Delhi Police, alleging that Gensol submitted forged documents. PFC has initiated an internal investigation and is evaluating legal and regulatory action against the company.
SEBI鈥檚 findings suggest that the misappropriated funds were primarily used to purchase electric vehicles for leasing to a related entity. However, the broader implications threaten India鈥檚 renewable energy deployment, particularly the execution of capital-intensive EPC contracts that demand financial discipline and credibility.
According to Gensol鈥檚 latest investor update for the December quarter of FY25, the firm had a pending order book of Rs 700 billion, with Rs 292.8 billion worth of solar EPC projects booked in just the third quarter.
If rebidding occurs, it could delay multiple green energy deployments and lead to disruptions in India鈥檚 clean energy targets, already under pressure due to financing and execution challenges in the sector.
Next Story
MoHUA Plans New Role for Smart City SPVs
In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..
Next Story
ADB Approves $110 Million Loan to Boost Skills in Gujarat
The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..
Next Story
SDAL Tests Rudrastra UAV and Bhargavastra Defence System
Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..