亚博体育官网首页

Greenko to set up hybrid energy project in Rajasthan
POWER & RENEWABLE ENERGY

Greenko to set up hybrid energy project in Rajasthan

Indian renewable energy company Greenko Energy is set to develop a Rs 30,000-crore hybrid project in Rajasthan, of which one will be a pumped hydro storage project of 2,520 megawatt (MW) capacity at an estimated cost of Rs 11,882 crore.

The proposed hydro project is to be developed at Shahpur, Baran district of Rajasthan and is to be completed by 2023-24.

Greenko Group has a current operational capacity of about 7 gigawatt (GW) and a pipeline of around 8 GW.

Rajasthan has been promoting power storage solutions under the Rajasthan Solar Energy Policy 2019. The Rajasthan Renewable Energy Corporation (RREC) has received several proposals for energy storage projects following the policy incentives.

The hydropower-based storage project will be integrated with a combination of solar, wind and hydropower.

Rajasthan has set the target of 30,000 MW solar power projects up to 2024-25. The release added that the generated power would be used by discoms or other entities to meet their demand and for the fulfilment of the renewable purchase obligation as determined by RERC under the Solar Policy.

Greenko is an Indian renewable energy company with headquarters in Hyderabad. The firm has replaced fossil fuels with integrated decarbonised energy and grid assets enabling sustainable and affordable energy, with a net installed capacity of 6.2 GWdc across 15 States in India. The company has already initiated Integrated Renewable Energy Storage Projects in Karnataka, Madhya Pradesh and Andhra Pradesh.


Also read: Eden secures $165 mn finance for 450 MW solar project

Indian renewable energy company Greenko Energy is set to develop a Rs 30,000-crore hybrid project in Rajasthan, of which one will be a pumped hydro storage project of 2,520 megawatt (MW) capacity at an estimated cost of Rs 11,882 crore. The proposed hydro project is to be developed at Shahpur, Baran district of Rajasthan and is to be completed by 2023-24. Greenko Group has a current operational capacity of about 7 gigawatt (GW) and a pipeline of around 8 GW. Rajasthan has been promoting power storage solutions under the Rajasthan Solar Energy Policy 2019. The Rajasthan Renewable Energy Corporation (RREC) has received several proposals for energy storage projects following the policy incentives. The hydropower-based storage project will be integrated with a combination of solar, wind and hydropower. Rajasthan has set the target of 30,000 MW solar power projects up to 2024-25. The release added that the generated power would be used by discoms or other entities to meet their demand and for the fulfilment of the renewable purchase obligation as determined by RERC under the Solar Policy. Greenko is an Indian renewable energy company with headquarters in Hyderabad. The firm has replaced fossil fuels with integrated decarbonised energy and grid assets enabling sustainable and affordable energy, with a net installed capacity of 6.2 GWdc across 15 States in India. The company has already initiated Integrated Renewable Energy Storage Projects in Karnataka, Madhya Pradesh and Andhra Pradesh. Image Source Also read: Eden secures $165 mn finance for 450 MW solar project

Next Story
Infrastructure Urban

MoHUA Plans New Role for Smart City SPVs

In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..

Next Story
Infrastructure Urban

ADB Approves $110 Million Loan to Boost Skills in Gujarat

The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..

Next Story
Infrastructure Urban

SDAL Tests Rudrastra UAV and Bhargavastra Defence System

Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement