ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

HPCL seek bids for EPC of 9.2 MW of solar projects in Delhi
POWER & RENEWABLE ENERGY

HPCL seek bids for EPC of 9.2 MW of solar projects in Delhi

In Delhi, Hindustan Petroleum Corporation is soliciting offers for the engineering, procurement, and construction of two grid-connected ground mounted solar power plants. Under the group or virtual net-metering strategy, the projects include a 4.2 MW solar project in Pitampura for Tata Power and a 5 MW solar project in Moti Nagar for BSES Rajdhani.

The projects must be completed within six months of the work order being issued. In addition, the contractor must provide full operation and maintenance for a period of ten years.

The deadline for bids is June 5, 2023. On the same day, the bids will be opened.

Bidders must submit a Rs 4.45 million ($54,131) earnest money deposit for the Pitampura project and Rs 4.1 million ($49,874) for the Moti Nagar project. Bidders should total up the EMD amounts listed above and submit them if they are quoting for several schedules.

Bidders must have completed a ground-mounted solar project of at least 500 kW under a group/virtual net metering policy, with or without related transmission line work, and must have provided comprehensive operation and maintenance for a minimum of one year within the previous seven years.

During the previous three years, bidders should have had an average yearly financial turnover of Rs 2.42 million ($294,378).

If micro and small businesses achieve the quality and technical parameters of the bid services, the technical and financial criteria will be lowered by 15%.

If suitable agricultural land parcels for the complete capacity are few in one place, the bidder can install the overall project capacity at several locations within the same distribution company (DISCOM) licensed region. The capacity of an agricultural land parcel, on the other hand, should not be less than 1 MW.

The contractor must register the projects under the Mukhya Mantri Kisan Aay Badhotari Yojna and arrange for DISCOM to construct a transmission connection connecting the solar project to the substation.

The solar modules used in the project must come from the Ministry of New and Renewable Energy's Approved List of types and manufacturers, and they must have a minimum capacity of 540 MW. In addition, the module efficiency should be at least 16%.

HPCL requested bids last month for the EPC of 11 MW of solar power projects for captive usage in Uttar Pradesh and Haryana at its Panipat and Jhansi sites.

See also:
Haryana seeks bids to procure 500 MW of solar power
MSEDCL releases tender for 615 MW Solar Power Projects


In Delhi, Hindustan Petroleum Corporation is soliciting offers for the engineering, procurement, and construction of two grid-connected ground mounted solar power plants. Under the group or virtual net-metering strategy, the projects include a 4.2 MW solar project in Pitampura for Tata Power and a 5 MW solar project in Moti Nagar for BSES Rajdhani. The projects must be completed within six months of the work order being issued. In addition, the contractor must provide full operation and maintenance for a period of ten years. The deadline for bids is June 5, 2023. On the same day, the bids will be opened. Bidders must submit a Rs 4.45 million ($54,131) earnest money deposit for the Pitampura project and Rs 4.1 million ($49,874) for the Moti Nagar project. Bidders should total up the EMD amounts listed above and submit them if they are quoting for several schedules. Bidders must have completed a ground-mounted solar project of at least 500 kW under a group/virtual net metering policy, with or without related transmission line work, and must have provided comprehensive operation and maintenance for a minimum of one year within the previous seven years. During the previous three years, bidders should have had an average yearly financial turnover of Rs 2.42 million ($294,378). If micro and small businesses achieve the quality and technical parameters of the bid services, the technical and financial criteria will be lowered by 15%. If suitable agricultural land parcels for the complete capacity are few in one place, the bidder can install the overall project capacity at several locations within the same distribution company (DISCOM) licensed region. The capacity of an agricultural land parcel, on the other hand, should not be less than 1 MW. The contractor must register the projects under the Mukhya Mantri Kisan Aay Badhotari Yojna and arrange for DISCOM to construct a transmission connection connecting the solar project to the substation. The solar modules used in the project must come from the Ministry of New and Renewable Energy's Approved List of types and manufacturers, and they must have a minimum capacity of 540 MW. In addition, the module efficiency should be at least 16%. HPCL requested bids last month for the EPC of 11 MW of solar power projects for captive usage in Uttar Pradesh and Haryana at its Panipat and Jhansi sites. See also: Haryana seeks bids to procure 500 MW of solar powerMSEDCL releases tender for 615 MW Solar Power Projects

Next Story
Infrastructure Transport

Dassault To Build Falcon Jets In India With Reliance

Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..

Next Story
Infrastructure Urban

INDEA Lays Foundation for India’s First Auto Design School

The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..

Next Story
Infrastructure Transport

Karnataka Launches Global Innovation Hub at Airport City

The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement