亚博体育官网首页

JSW Renew inks pact with SECI to supply 270 MW wind capacity
POWER & RENEWABLE ENERGY

JSW Renew inks pact with SECI to supply 270 MW wind capacity

JSW Renew Energy (JSWREL) has signed a power purchase agreement (PPA) with Solar Energy Corporation of India (SECI) to deliver 270 MW from its 810 MW wind capacity.

According to a Bombay Stock Exchange (BSE) filing, the signing of this PPA ties up the entire 810 MW awarded capacity with SECI.

JSW Future Energy (JSWFEL, formerly known as JSW Solar), a wholly-owned subsidiary of the company, received a letter of award from SECI in September 2020 for a total blended wind capacity of 810 MW with the tariff-based competitive bid invited by the SECI for the establishment of 2,500 MW ISTS-connected Blended Wind Power Projects (Tranche - IX).

JSWREL, a JSWFEL subsidiary, signed a PPA with SECI in May for 540 MW of contracted capacity out of a total capacity of 810 MW.

JSW Energy has a total capacity of 4,559 MW, with around 30% of that coming from renewable sources.

The company is currently constructing various renewable power projects totalling 2.5 GW through its wholly-owned subsidiaries, JSWFEL and JSW Hydro Energy Limited, with a goal of reaching a total power generation capacity of 20 GW by 2030, when the share of renewables in total capacity will increase to 85%.


Also read: SECI invites bids for O&M of 1 MW rooftop solar projects

Also read: SECI invites bids for 2,000 MWh of energy storage systems

JSW Renew Energy (JSWREL) has signed a power purchase agreement (PPA) with Solar Energy Corporation of India (SECI) to deliver 270 MW from its 810 MW wind capacity. According to a Bombay Stock Exchange (BSE) filing, the signing of this PPA ties up the entire 810 MW awarded capacity with SECI. JSW Future Energy (JSWFEL, formerly known as JSW Solar), a wholly-owned subsidiary of the company, received a letter of award from SECI in September 2020 for a total blended wind capacity of 810 MW with the tariff-based competitive bid invited by the SECI for the establishment of 2,500 MW ISTS-connected Blended Wind Power Projects (Tranche - IX). JSWREL, a JSWFEL subsidiary, signed a PPA with SECI in May for 540 MW of contracted capacity out of a total capacity of 810 MW. JSW Energy has a total capacity of 4,559 MW, with around 30% of that coming from renewable sources. The company is currently constructing various renewable power projects totalling 2.5 GW through its wholly-owned subsidiaries, JSWFEL and JSW Hydro Energy Limited, with a goal of reaching a total power generation capacity of 20 GW by 2030, when the share of renewables in total capacity will increase to 85%. Image Source Also read: SECI invites bids for O&M of 1 MW rooftop solar projects Also read: SECI invites bids for 2,000 MWh of energy storage systems

Next Story
Infrastructure Urban

MoHUA Plans New Role for Smart City SPVs

In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..

Next Story
Infrastructure Urban

ADB Approves $110 Million Loan to Boost Skills in Gujarat

The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..

Next Story
Infrastructure Urban

SDAL Tests Rudrastra UAV and Bhargavastra Defence System

Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement