ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

NTPC Renewable Energy invites bids for 1,000 MW hybrid power projects
POWER & RENEWABLE ENERGY

NTPC Renewable Energy invites bids for 1,000 MW hybrid power projects

NTPC Renewable Energy, a wholly-owned subsidiary of NTPC, is seeking proposals for the selection of hybrid power generators to supply 1,000 MW power from inter-state transmission system (ISTS)-connected wind-solar hybrid projects throughout India in Tranche-V.

Eligible projects, with or without an energy storage system (ESS), must be established on a build-own-operate basis. The ESS should be charged using a source other than wind-solar hybrid power to qualify as a hybrid power project.

The deadline for bid submission is February 27, 2024, with bid openings on the same day.

Hybrid power projects currently underway, awaiting commissioning, or already commissioned without a long-term power purchase agreement are eligible for consideration under this tender.

For contracting, the minimum required capacity is 50 MW, with subsequent increments in multiples of 10 MW. However, at least 33% of the total contracted capacity must come from either wind or solar resources.

Bidders are required to provide an earnest money deposit of Rs 1.26 million (~$15,171)/MW of the quoted capacity. Successful bidders must submit a performance bank guarantee of Rs 2.9 million (~$34,975)/MW of the allotted capacity.

Processing fees are structured based on the project's scale, ranging from Rs 300,000 ($3,612) plus 18% GST for projects up to 50 MW to Rs 2 million (~$24,081) plus 18% GST for capacities above 250 MW and up to 500 MW.

Wind turbines used in the projects must be type-certified models listed in the Ministry of New and Renewable Energy's Revised List of Models and Manufacturers. Solar photovoltaic modules must be included in List-I under the Approved Models and Manufacturers of Solar Photovoltaic Modules.

The tender aims to endorse commercially established and operational technologies to mitigate technology risks and ensure the timely initiation of power supply from the projects.

Bidders must have a net worth equal to or greater than Rs 11.46 million (~$138,218)/MW and a minimum annual turnover of Rs 6.15 million (~$74,177)/MW of the quoted capacity during the previous financial year, 2022-23, or at least seven days prior to the bid submission deadline.

NTPC recently invited bids for setting up 1,500 MW of ISTS-connected solar power projects across India.

NTPC Renewable Energy, a wholly-owned subsidiary of NTPC, is seeking proposals for the selection of hybrid power generators to supply 1,000 MW power from inter-state transmission system (ISTS)-connected wind-solar hybrid projects throughout India in Tranche-V. Eligible projects, with or without an energy storage system (ESS), must be established on a build-own-operate basis. The ESS should be charged using a source other than wind-solar hybrid power to qualify as a hybrid power project. The deadline for bid submission is February 27, 2024, with bid openings on the same day. Hybrid power projects currently underway, awaiting commissioning, or already commissioned without a long-term power purchase agreement are eligible for consideration under this tender. For contracting, the minimum required capacity is 50 MW, with subsequent increments in multiples of 10 MW. However, at least 33% of the total contracted capacity must come from either wind or solar resources. Bidders are required to provide an earnest money deposit of Rs 1.26 million (~$15,171)/MW of the quoted capacity. Successful bidders must submit a performance bank guarantee of Rs 2.9 million (~$34,975)/MW of the allotted capacity. Processing fees are structured based on the project's scale, ranging from Rs 300,000 ($3,612) plus 18% GST for projects up to 50 MW to Rs 2 million (~$24,081) plus 18% GST for capacities above 250 MW and up to 500 MW. Wind turbines used in the projects must be type-certified models listed in the Ministry of New and Renewable Energy's Revised List of Models and Manufacturers. Solar photovoltaic modules must be included in List-I under the Approved Models and Manufacturers of Solar Photovoltaic Modules. The tender aims to endorse commercially established and operational technologies to mitigate technology risks and ensure the timely initiation of power supply from the projects. Bidders must have a net worth equal to or greater than Rs 11.46 million (~$138,218)/MW and a minimum annual turnover of Rs 6.15 million (~$74,177)/MW of the quoted capacity during the previous financial year, 2022-23, or at least seven days prior to the bid submission deadline. NTPC recently invited bids for setting up 1,500 MW of ISTS-connected solar power projects across India.

Next Story
Infrastructure Transport

Dassault To Build Falcon Jets In India With Reliance

Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..

Next Story
Infrastructure Urban

INDEA Lays Foundation for India’s First Auto Design School

The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..

Next Story
Infrastructure Transport

Karnataka Launches Global Innovation Hub at Airport City

The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement