ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

Param Renewable bags IOCL’s 5 MW solar project
POWER & RENEWABLE ENERGY

Param Renewable bags IOCL’s 5 MW solar project

Gujarat-based Param Renewable Energy, the operation and maintenance (O&M) arm of Gensol, has been awarded a contract by the Indian Oil Corporation (IOCL) for the O&M of a 5 MW solar power project located at IOCL’s Rawra facility in the Jodhpur district of Rajasthan for three years.

Param Renewable quoted a figure of Rs 14.72 million for the O&M contract for three years. The tender was floated in March this year IOCL. The tender received technical bids from nine companies, of which only two qualified for financial evaluation, and the contract was awarded to Param Renewable Energy.

Shri Sai Electrical was the other company that qualified for the financial round. Param Renewable will be responsible for all types of preventive, scheduled, and breakdown maintenance with the objective of maximizing electricity generation.

The company must ensure a minimum performance ratio of 76%, subject to 99.6% grid availability. An initial security deposit of Rs 124,800 ($1,522) must be submitted by the company within 30 days from the issuance of the letter of acceptance.

Gujarat-based Param Renewable Energy, the operation and maintenance (O&M) arm of Gensol, has been awarded a contract by the Indian Oil Corporation (IOCL) for the O&M of a 5 MW solar power project located at IOCL’s Rawra facility in the Jodhpur district of Rajasthan for three years.Param Renewable quoted a figure of Rs 14.72 million for the O&M contract for three years. The tender was floated in March this year IOCL. The tender received technical bids from nine companies, of which only two qualified for financial evaluation, and the contract was awarded to Param Renewable Energy.Shri Sai Electrical was the other company that qualified for the financial round. Param Renewable will be responsible for all types of preventive, scheduled, and breakdown maintenance with the objective of maximizing electricity generation.The company must ensure a minimum performance ratio of 76%, subject to 99.6% grid availability. An initial security deposit of Rs 124,800 ($1,522) must be submitted by the company within 30 days from the issuance of the letter of acceptance.

Next Story
Infrastructure Transport

Dassault To Build Falcon Jets In India With Reliance

Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..

Next Story
Infrastructure Urban

INDEA Lays Foundation for India’s First Auto Design School

The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..

Next Story
Infrastructure Transport

Karnataka Launches Global Innovation Hub at Airport City

The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement