100-110 km Peripheral Ring Road Proposal for New Urban Dev Minister
06 Jun 2023
2 Min Read
CW Team
The Peripheral Ring Road in the outskirts of Mysuru is gaining momentum, as preparations are being made by the Mysuru Urban Development Authority (MUDA) to invite tenders for the appointment of an experienced Project Consultant. The purpose of this appointment is to prepare a Detailed Project Report (DPR). A budget of Rs 100 million has been allocated for the preparation of the DPR.
It is planned that the Peripheral Ring Road will encircle the existing 42.5-km Outer Ring Road, extending up to 100 or 110 kilometres. The project was initially approved by the Urban Development Department in December of the previous year. However, due to the elections and the subsequent implementation of the Model Code of Conduct, the process was delayed. With the new government now in place, it is expected that progress will be made in the right direction.
In a letter dated October 28, 2022, the MUDA Commissioner requested the approval of the Urban Development Department to hire a Project Consultant. The letter emphasised the need for the development of a Peripheral Ring Road in Mysuru City due to the presence of commercial clusters and the growth of industrial activities. The Peripheral Ring Road will be a 45-metre-wide road and will require the acquisition of a total area of 824 acres. Additionally, a total area of 27,500 acres will be acquired for the Town Planning Scheme, with 750 metres on each side of the Peripheral Ring Road. The road will consist of six main lanes and four lanes for the service road.
The estimated cost of the project is Rs 19.71 billion, which includes Rs 12.36 billion for land acquisition and Rs 7.35 billion for road construction. The primary objective is to reduce traffic congestion on the existing 42.5 km long six-lane Outer Ring Road, which connects Mysuru-Bengaluru Highway, KRS Road, Hunsur Highway, Bogadi Road, H D Kote Road, Nanjangud Road, T Narasipur Road, Bannur Road, and Mahadevapura Road.
A request has been made to B T Sridhar, the Project Director of the National Highways Authority of India (NHAI), to provide an outline of the proposed road and its technical details. This request was made considering Sridhar's experience in the construction of the Expressway from Mysuru to Bengaluru. Sridhar has agreed to contribute valuable input for the project.
Also read:
TDR allowed for buildings on internal layout roads
Gehlot commences Rs 33.78 bn road projects
The Peripheral Ring Road in the outskirts of Mysuru is gaining momentum, as preparations are being made by the Mysuru Urban Development Authority (MUDA) to invite tenders for the appointment of an experienced Project Consultant. The purpose of this appointment is to prepare a Detailed Project Report (DPR). A budget of Rs 100 million has been allocated for the preparation of the DPR.
It is planned that the Peripheral Ring Road will encircle the existing 42.5-km Outer Ring Road, extending up to 100 or 110 kilometres. The project was initially approved by the Urban Development Department in December of the previous year. However, due to the elections and the subsequent implementation of the Model Code of Conduct, the process was delayed. With the new government now in place, it is expected that progress will be made in the right direction.
In a letter dated October 28, 2022, the MUDA Commissioner requested the approval of the Urban Development Department to hire a Project Consultant. The letter emphasised the need for the development of a Peripheral Ring Road in Mysuru City due to the presence of commercial clusters and the growth of industrial activities. The Peripheral Ring Road will be a 45-metre-wide road and will require the acquisition of a total area of 824 acres. Additionally, a total area of 27,500 acres will be acquired for the Town Planning Scheme, with 750 metres on each side of the Peripheral Ring Road. The road will consist of six main lanes and four lanes for the service road.
The estimated cost of the project is Rs 19.71 billion, which includes Rs 12.36 billion for land acquisition and Rs 7.35 billion for road construction. The primary objective is to reduce traffic congestion on the existing 42.5 km long six-lane Outer Ring Road, which connects Mysuru-Bengaluru Highway, KRS Road, Hunsur Highway, Bogadi Road, H D Kote Road, Nanjangud Road, T Narasipur Road, Bannur Road, and Mahadevapura Road.
A request has been made to B T Sridhar, the Project Director of the National Highways Authority of India (NHAI), to provide an outline of the proposed road and its technical details. This request was made considering Sridhar's experience in the construction of the Expressway from Mysuru to Bengaluru. Sridhar has agreed to contribute valuable input for the project.
Also read:
TDR allowed for buildings on internal layout roadsGehlot commences Rs 33.78 bn road projects
Next Story
Dassault To Build Falcon Jets In India With Reliance
Reliance Infrastructure Ltd’s subsidiary, Reliance Aerostructure, has signed an agreement with France’s Dassault Aviation to manufacture Falcon 2000 business jets in India, with the first batch expected to roll out from its Nagpur facility by 2028. This marks the first time a Falcon aircraft will be entirely built outside France.The announcement sent Reliance Infrastructure shares surging, hitting the 5 per cent upper circuit on the BSE. Anil Ambani, Chairman of Reliance Group, hailed the agreement as a “symbol of India’s technological and manufacturing strength�, adding that it aims..
Next Story
INDEA Lays Foundation for India’s First Auto Design School
The Indian School for Design of Automobiles (INDEA), the country’s first institute focused solely on automobile design and management, held its foundation stone ceremony at XLRI Delhi-NCR. The event was graced by Union Minister for Road Transport and Highways, Nitin Gadkari, who virtually unveiled the stone as Chief Guest.INDEA aims to become a premier talent hub, driving innovation in the Indian automotive sector. The school will focus on advanced design, mobility solutions, and sustainable practices, playing a vital role in shaping India’s transition from a cost-driven to a quality-led a..
Next Story
Karnataka Launches Global Innovation Hub at Airport City
The Government of Karnataka, in collaboration with Bengaluru Airport City Limited (BACL) and ANSR, has launched a global innovation hub named District I at Bengaluru Airport City's business park. The initiative aims to elevate India’s innovation ecosystem to a global scale by fostering collaboration among startups, academia, enterprises, and government bodies.District I will serve as a platform for deep-tech entrepreneurship, enterprise innovation, and commercialisation of academic research. It brings together Global Capability Centres (GCCs), IT firms, corporate labs, startups, venture capi..