ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

NHAI Signs Rs 70 Bn Pact for Guwahati Ring Road Project
ROADS & HIGHWAYS

NHAI Signs Rs 70 Bn Pact for Guwahati Ring Road Project

In a major boost to connectivity in Northeast India, the National Highways Authority of India (NHAI) has signed a concession agreement for the construction of the much-anticipated Guwahati Ring Road with infrastructure firm M/s Dineshchandra R Agrawal Infracon Pvt. Ltd.

The agreement, finalised in the presence of NHAI Chairman Santosh Kumar Yadav and senior officials from the Ministry of Road Transport and Highways, marks a significant step towards decongesting Guwahati’s urban traffic and enhancing regional logistics efficiency.

The 121-kilometre ring road will be executed under the Build-Operate-Toll (BOT) model, notably without any government grant—signalling robust private sector confidence in infrastructure projects in the Northeast. While the overall cost is pegged at approximately ?7,000 crore (including land acquisition and utility shifting), the construction expenditure alone is expected to be around ?5,729 crore.

Designed to divert heavy vehicles away from city roads, the project is expected to ease traffic congestion, reduce pollution, enhance road safety, and cut travel time. Once complete, it will not only benefit Guwahati—Assam’s gateway to the Northeast—but also improve connectivity to neighbouring states including Meghalaya, Arunachal Pradesh, and Nagaland.

Officials noted that the project will also foster commercial development by improving linkages between industrial zones, border trade points, and rural hinterlands. It will be integrated with key national highways and transport corridors under national infrastructure programmes such as PM Gati Shakti and the Act East Policy.

A senior NHAI official described the project as “a strategic move towards improved regional connectivity and inclusive development in the Northeast.�

The concessionaire will be responsible for operating and maintaining the road during the contract period, recovering costs through toll collection. While the precise construction timeline is yet to be announced, work on the project is expected to commence shortly.

In a major boost to connectivity in Northeast India, the National Highways Authority of India (NHAI) has signed a concession agreement for the construction of the much-anticipated Guwahati Ring Road with infrastructure firm M/s Dineshchandra R Agrawal Infracon Pvt. Ltd. The agreement, finalised in the presence of NHAI Chairman Santosh Kumar Yadav and senior officials from the Ministry of Road Transport and Highways, marks a significant step towards decongesting Guwahati’s urban traffic and enhancing regional logistics efficiency. The 121-kilometre ring road will be executed under the Build-Operate-Toll (BOT) model, notably without any government grant—signalling robust private sector confidence in infrastructure projects in the Northeast. While the overall cost is pegged at approximately ?7,000 crore (including land acquisition and utility shifting), the construction expenditure alone is expected to be around ?5,729 crore. Designed to divert heavy vehicles away from city roads, the project is expected to ease traffic congestion, reduce pollution, enhance road safety, and cut travel time. Once complete, it will not only benefit Guwahati—Assam’s gateway to the Northeast—but also improve connectivity to neighbouring states including Meghalaya, Arunachal Pradesh, and Nagaland. Officials noted that the project will also foster commercial development by improving linkages between industrial zones, border trade points, and rural hinterlands. It will be integrated with key national highways and transport corridors under national infrastructure programmes such as PM Gati Shakti and the Act East Policy. A senior NHAI official described the project as “a strategic move towards improved regional connectivity and inclusive development in the Northeast.� The concessionaire will be responsible for operating and maintaining the road during the contract period, recovering costs through toll collection. While the precise construction timeline is yet to be announced, work on the project is expected to commence shortly.

Next Story
Infrastructure Urban

Maruti Suzuki, Equitas Bank Tie Up for Car Financing

Maruti Suzuki India Ltd has signed a memorandum of understanding (MoU) with Equitas Small Finance Bank to expand vehicle financing access for its customers across India. The collaboration aims to provide a range of tailored and affordable financing solutions for new cars, used cars, and commercial vehicles.The agreement was formalised with Maruti Suzuki’s Senior Executive Officer Partho Banerjee and Equitas Bank’s Head of Retail Assets, Jagadesh J, exchanging documents in the presence of officials from both organisations.In a statement, Maruti Suzuki said the partnership would enhance affo..

Next Story
Infrastructure Urban

NAKSHA Phase 2 Training for ULB Officers Begins 16 June

The Department of Land Resources (DoLR), under the Ministry of Rural Development, will commence the second batch of Phase 2 training under the NAKSHA (NAtional geospatial Knowledge-based land Survey of urban HAbitations) programme from 16 June 2025. The training will be conducted at four Centres of Excellence (CoEs) across the country and aims to build capacity for accurate, technology-driven urban land surveys.The programme will be virtually inaugurated by Shri Manoj Joshi, Secretary of DoLR, on 16 June at 10:00 a.m. A total of 128 officers from around 74 Urban Local Bodies (ULBs) have been n..

Next Story
Infrastructure Urban

GRAP Stage-I Revoked as Delhi AQI Improves to 140

The Air Quality Index (AQI) in Delhi reached 140 on 15 June 2025, categorised as 'Moderate', according to the Central Pollution Control Board’s (CPCB) daily bulletin. With steady improvement in air quality and favourable forecasts from IITM and the India Meteorological Department (IMD), the Commission for Air Quality Management (CAQM) has revoked Stage-I of the Graded Response Action Plan (GRAP) across the National Capital Region (NCR) with immediate effect.The decision was made during a review meeting of the CAQM’s Sub-Committee on GRAP, which assessed overall regional air quality data an..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement