Terratec TBM T87 tunnels 526 m deep in Mumbai鈥檚 water project
17 Jan 2022
2 Min Read
CW Team
Soma Enterprise Limited has deployed the Terratec T87 tunnel boring machine (TBM) for a water project in Mumbai, which tunneled down 526 m deep in December 2021 without any fanfare.
The Open Rock TBM of 3.2 m diameter was recorded for the Municipal Corporation of Greater Mumbai's (MCGMs) 9.683 km Amar Mahar-I (AM-I) project to fulfil the growing demand in eastern Mumbai.
The AM-I tunnel (AMT-I) project begins from Hedgewar Udyan, where the tunnel will be used between Mumbai-II and Mumbai-III on the Eastern Express Highway. It will run across Hedgewar Udyan to Parel through Wadala.
The AMT-1 project includes two TBM drivers of 9,683 m between Hedgewar Udyan, Pratiksha Nagar and Parel, having 80-90 m of water transfer.
The new TBM has excavated over 1 km in three months, with remaining progress of over 300 m per month.
The company is a leading TBM supplier with more than 40 TBMs ranging between 1.4 m to 10 m excavation. The machine can be used in other projects, including hydro, sewage, and mining projects. It has deployed leading contractors, including Larsen and Toubro (L&T), Hindustan Construction Company (HCC), Afcons, etc.
The Greater Mumbai civic body has executed this project for checking the water sources, improving the water distribution system and managing water demand and supply.
One of the most challenging parts of AMT-I was to assemble the TBM at 110 m depth inside the Amar Mahal site's tail tunnel.
It is expected that the first project groundbreaking at Pratiksha Nagar Shaft will take place in the first quarter (Q1) of FY23.
The metro rail and road tunnelling projects get more visibility, but the TBM project might bring more visibility in tunnel projects.
Soma Enterprise Limited has deployed the Terratec T87 tunnel boring machine (TBM) for a water project in Mumbai, which tunneled down 526 m deep in December 2021 without any fanfare.
The Open Rock TBM of 3.2 m diameter was recorded for the Municipal Corporation of Greater Mumbai's (MCGMs) 9.683 km Amar Mahar-I (AM-I) project to fulfil the growing demand in eastern Mumbai.
The AM-I tunnel (AMT-I) project begins from Hedgewar Udyan, where the tunnel will be used between Mumbai-II and Mumbai-III on the Eastern Express Highway. It will run across Hedgewar Udyan to Parel through Wadala.
The AMT-1 project includes two TBM drivers of 9,683 m between Hedgewar Udyan, Pratiksha Nagar and Parel, having 80-90 m of water transfer.
The new TBM has excavated over 1 km in three months, with remaining progress of over 300 m per month.
The company is a leading TBM supplier with more than 40 TBMs ranging between 1.4 m to 10 m excavation. The machine can be used in other projects, including hydro, sewage, and mining projects. It has deployed leading contractors, including Larsen and Toubro (L&T), Hindustan Construction Company (HCC), Afcons, etc.
The Greater Mumbai civic body has executed this project for checking the water sources, improving the water distribution system and managing water demand and supply.
One of the most challenging parts of AMT-I was to assemble the TBM at 110 m depth inside the Amar Mahal site's tail tunnel.
It is expected that the first project groundbreaking at Pratiksha Nagar Shaft will take place in the first quarter (Q1) of FY23.
The metro rail and road tunnelling projects get more visibility, but the TBM project might bring more visibility in tunnel projects.
Image Source
Next Story
Mahindra Lifespaces Bags Rs 12.5 billion Redevelopment in Mulund
Mahindra Lifespace Developers (MLDL), the real estate and infrastructure development arm of the Mahindra Group, has been appointed as the preferred developer for the redevelopment of a premium housing society in Mulund (West), Mumbai. The project will be developed across a 3.08-acre land parcel, with an estimated development value of approximately Rs 12.5 billion. Strategically located, the site enjoys proximity to major connectivity points鈥攋ust 1.4 km from the upcoming Mumbai Metro Line 5 and 0.8 km from the Goregaon-Mulund Link Road. It also offers seamless access to the Eastern Expre..
Next Story
Snowman Adds Warehouses in Kolkata and Krishnapatnam
Snowman Logistics, India鈥檚 leading integrated temperature-controlled logistics company, has announced the commencement of operations at its two new state-of-the-art, owned cold storage facilities in Kolkata and Krishnapatnam. With these additions, the company鈥檚 total pallet capacity has reached 1,50,754, spanning 43 warehouses in 20 cities across the country. The newly operational Kolkata facility offers a storage capacity of 5,630 pallets, while the Krishnapatnam facility holds 3,927 pallets. These warehouses are equipped with advanced automation and infrastructure designed to enhanc..
Next Story
Noesis Enables IHCL Hotel Deal in Udupi鈥揗anipal Corridor
NOESIS Capital Advisors, India鈥檚 leading hotel investment advisory firm, has successfully facilitated a landmark hospitality transaction in the Udupi鈥揗anipal region of Karnataka. The deal involves the acquisition of a nearly completed, 130-key upscale hotel that will operate under one of the premium brands of IHCL, reinforcing NOESIS鈥� position as a preferred partner for strategic hospitality transactions across India. Strategically located on the Udupi鈥揗anipal Highway, the 1.03-acre property will cater to business travellers, pilgrims and families visiting Manipal University. With..