Global companies to develop Railways' Gujarat loco facility
18 Jun 2022
2 Min Read
CW Team
Global players such as Alstom, Siemens, Hitachi, Stadler Rail, Wabtec, and Arco evinced interest to develop a new locomotive facility for the Indian Railways at an estimated cost of Rs 20,000 crore in Dahod, Gujarat.
Several overseas and local companies had participated in the pre-bid consultations for the 1,200 electric locomotives of 9,000 horsepower (HP) manufacture and supply.
Domestic companies comprise Bharat Heavy Electricals Limited, Medha Group, and CG Power and Industrial Solutions.
The trains will be supplied over a period of 11 years from 2023-24 to 2033-34 at the current rolling stock workshop in Dahod. The workshop had been established in 1926 for the periodic overhaul of steam locomotives. It will be upgraded to an electric locomotive manufacturing unit having infrastructural improvements.
The proposed facility shall manufacture the 1,200 HP electric locomotives - broad gauge for Indian Railways and standard gauge for exports. The train engines will be used across the network of Indian Railways for hauling 4,500 tonne load, having an average speed of 75 km per hour by a single locomotive.
The technology partner will be selected post-tender would have to upgrade the existing facilities while developing existing ones at the manufacturing site along with the nominated government maintenance depots.
As per the tender document, the four nominated government depots for maintenance of the locomotives would have a holding capacity of 300 each. The depots are located at Kharagpur, Visakhapatnam, Raipur, and Pune.
Also read: Quality Buildcon bags contract for Delhi metro depot expansion work
Global players such as Alstom, Siemens, Hitachi, Stadler Rail, Wabtec, and Arco evinced interest to develop a new locomotive facility for the Indian Railways at an estimated cost of Rs 20,000 crore in Dahod, Gujarat.
Several overseas and local companies had participated in the pre-bid consultations for the 1,200 electric locomotives of 9,000 horsepower (HP) manufacture and supply.
Domestic companies comprise Bharat Heavy Electricals Limited, Medha Group, and CG Power and Industrial Solutions.
The trains will be supplied over a period of 11 years from 2023-24 to 2033-34 at the current rolling stock workshop in Dahod. The workshop had been established in 1926 for the periodic overhaul of steam locomotives. It will be upgraded to an electric locomotive manufacturing unit having infrastructural improvements.
The proposed facility shall manufacture the 1,200 HP electric locomotives - broad gauge for Indian Railways and standard gauge for exports. The train engines will be used across the network of Indian Railways for hauling 4,500 tonne load, having an average speed of 75 km per hour by a single locomotive.
The technology partner will be selected post-tender would have to upgrade the existing facilities while developing existing ones at the manufacturing site along with the nominated government maintenance depots.
As per the tender document, the four nominated government depots for maintenance of the locomotives would have a holding capacity of 300 each. The depots are located at Kharagpur, Visakhapatnam, Raipur, and Pune.
Image SourceAlso read: Quality Buildcon bags contract for Delhi metro depot expansion work
Next Story
SRA Launches SoftTech鈥檚 AutoDCR to Fast-Track Redevelopment
In a major step towards modernising urban redevelopment in Mumbai, the Slum Rehabilitation Authority (SRA) has implemented the SoftTech AutoDCR Online Building Permission System. The digital rollout aims to enhance transparency, reduce manual interventions, and speed up project approvals in the city鈥檚 slum rehabilitation efforts. Developed by SoftTech Engineers, a company focused on technology solutions for the Architecture, Engineering and Construction (AEC) industry, AutoDCR automates the scrutiny and approval of building plans. By enabling developers to submit proposals online, it re..
Next Story
Desi Machines Brings Clarity to Equipment Decisions
India鈥檚 construction sector is expanding rapidly 鈥� from metros to villages, activity is surging in roads, bridges, homes, and industrial infrastructure. To support this growth, contractors, builders and machine operators need reliable equipment. However, making the right machinery choice is often confusing and overwhelming. Buyers frequently face uncertainty 鈥� not just over which brand to trust, but over which machine type suits their need. Should one opt for an excavator or backhoe loader? Is it more economical to buy one medium excavator or two smaller ones? Should they buy new or..
Next Story
Omaxe Launches Rs 10 billion Township Project in Amritsar
Real estate major Omaxe has launched a new integrated township, New Amritsar, on the GT Road corridor with an investment of over Rs 10 billion. The company has acquired 260 acres for the project, of which 127 acre will be developed in the first phase through its subsidiaries. Strategically located just 12 minutes from the Golden Temple, the township will include residential plots of 300, 500, and 1000 sq yards, along with commercial spaces, a school, a hotel, an exclusive clubhouse, and infrastructure amenities such as 24x7 security, wide internal roads, landscaped greens, and utility ser..