亚博体育官网首页

K-RIDE to float tender for Bengaluru suburban rail project
RAILWAYS & METRO RAIL

K-RIDE to float tender for Bengaluru suburban rail project

Managing Director of Rail Infrastructure Development Company Karnataka Limited (K-RIDE), Amit Garg, told the media that the delayed Bengaluru suburban rail project worth Rs 15,657 crore is ready to invite bids for civil works.

K-RIDE was formed earlier by the Karnataka government, and the Ministry of Railway is executing the 148 km long rail project. The railway project will have four corridors, including KSR Bengaluru City-Yelahanka-Devanahalli, Byappanahalli-Yeshwantpur-Chikkabanavara, Kengeri-Cantonment-Whitefield, and Heelalige-Yelahanka-Rajanukunte.

Garg told the media that the rail project is on track, and the department is planning to float its first civil work tender soon. All the preparatory tender work is completed. K-RIDE will finalise the civil work tender of Kanaka Line by February 2022.

He further added that about 85% of the land is acquired. Around 5-6% of land from the state government and 7-8% from the individuals will soon be acquired. The trees felling during the Namma metro project and building suburban corridors along the existing railway track is the main issue for K-RIDE.

The operations department of the railways is rarely allowed to construct along the operational railway tracks.


Also read: Bengaluru suburban rail: 800 cr allocated, metro to be audited

Managing Director of Rail Infrastructure Development Company Karnataka Limited (K-RIDE), Amit Garg, told the media that the delayed Bengaluru suburban rail project worth Rs 15,657 crore is ready to invite bids for civil works. K-RIDE was formed earlier by the Karnataka government, and the Ministry of Railway is executing the 148 km long rail project. The railway project will have four corridors, including KSR Bengaluru City-Yelahanka-Devanahalli, Byappanahalli-Yeshwantpur-Chikkabanavara, Kengeri-Cantonment-Whitefield, and Heelalige-Yelahanka-Rajanukunte. Garg told the media that the rail project is on track, and the department is planning to float its first civil work tender soon. All the preparatory tender work is completed. K-RIDE will finalise the civil work tender of Kanaka Line by February 2022. He further added that about 85% of the land is acquired. Around 5-6% of land from the state government and 7-8% from the individuals will soon be acquired. The trees felling during the Namma metro project and building suburban corridors along the existing railway track is the main issue for K-RIDE. The operations department of the railways is rarely allowed to construct along the operational railway tracks. Image Source Also read: Bengaluru suburban rail: 800 cr allocated, metro to be audited

Next Story
Infrastructure Urban

MoHUA Plans New Role for Smart City SPVs

In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..

Next Story
Infrastructure Urban

ADB Approves $110 Million Loan to Boost Skills in Gujarat

The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..

Next Story
Infrastructure Urban

SDAL Tests Rudrastra UAV and Bhargavastra Defence System

Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement