亚博体育官网首页

Kolkata Metro Services Suspended between Howrah Maidan and Sector V
RAILWAYS & METRO RAIL

Kolkata Metro Services Suspended between Howrah Maidan and Sector V

The Metro Railways Kolkata announced that metro services will be suspended from Howrah Maidan to Sector V in Salt Lake for three days, starting April 26, due to testing of the automated signalling and train operating system along the 16.6 km stretch.

In a statement, the Kolkata Metro informed that the suspension was necessary for testing the effectiveness of the 鈥楥ommunication-based Train Control鈥� (CBTC) system from Howrah Maidan to Sector V.

The statement also mentioned that there would be a complete traffic block from Howrah Maidan to Salt Lake Sector V of the Green Line from April 26 (Saturday) to April 28 (Monday) for the CBTC system testing and for inspection related to the commissioning of the Esplanade-Sealdah section.

During this period, the inter-connecting subway between Sealdah Metro station and the Sealdah station of the Eastern Railway will be closed.

Due to this traffic block, there will be no special Metro service on the Green Line-2 after the Kolkata Knight Riders' IPL match at Eden Gardens on April 26 (Saturday) night. However, special Metro services on the Blue Line (Dakshineswar-New Garia) will be available after the match.

Currently, metro services are operational in the Howrah Maidan-Esplanade section and the Sealdah-Sector V stretches of Green Line, known as Green Line-1 and Green Line-2.

Metro services on the entire stretch were delayed after a ground cave-in in the Bowbazar area between the Esplanade-Sealdah stretch in 2018 during tunneling work. As a result, services have been operating in two sections.

A Metro Railway spokesperson confirmed that services along the entire stretch would be commissioned soon after inspection by the Commissioner of Railway Safety (CRS) and approval from the Railway Ministry.

News source: India TV news

The Metro Railways Kolkata announced that metro services will be suspended from Howrah Maidan to Sector V in Salt Lake for three days, starting April 26, due to testing of the automated signalling and train operating system along the 16.6 km stretch. In a statement, the Kolkata Metro informed that the suspension was necessary for testing the effectiveness of the 鈥楥ommunication-based Train Control鈥� (CBTC) system from Howrah Maidan to Sector V. The statement also mentioned that there would be a complete traffic block from Howrah Maidan to Salt Lake Sector V of the Green Line from April 26 (Saturday) to April 28 (Monday) for the CBTC system testing and for inspection related to the commissioning of the Esplanade-Sealdah section. During this period, the inter-connecting subway between Sealdah Metro station and the Sealdah station of the Eastern Railway will be closed. Due to this traffic block, there will be no special Metro service on the Green Line-2 after the Kolkata Knight Riders' IPL match at Eden Gardens on April 26 (Saturday) night. However, special Metro services on the Blue Line (Dakshineswar-New Garia) will be available after the match. Currently, metro services are operational in the Howrah Maidan-Esplanade section and the Sealdah-Sector V stretches of Green Line, known as Green Line-1 and Green Line-2. Metro services on the entire stretch were delayed after a ground cave-in in the Bowbazar area between the Esplanade-Sealdah stretch in 2018 during tunneling work. As a result, services have been operating in two sections. A Metro Railway spokesperson confirmed that services along the entire stretch would be commissioned soon after inspection by the Commissioner of Railway Safety (CRS) and approval from the Railway Ministry. News source: India TV news

Next Story
Infrastructure Urban

MoHUA Plans New Role for Smart City SPVs

In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..

Next Story
Infrastructure Urban

ADB Approves $110 Million Loan to Boost Skills in Gujarat

The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..

Next Story
Infrastructure Urban

SDAL Tests Rudrastra UAV and Bhargavastra Defence System

Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement