亚博体育官网首页

Nearly Entire Delhi-Meerut RRTS Corridor to Open by June, 10 Mn Served
RAILWAYS & METRO RAIL

Nearly Entire Delhi-Meerut RRTS Corridor to Open by June, 10 Mn Served

By the end of June, travel time from Sarai Kale Khan in Delhi to Modipuram in Uttar Pradesh鈥檚 Meerut is expected to be just 45 minutes, as the final phase of India鈥檚 first Regional Rapid Transit System (RRTS) corridor nears completion, according to officials.

The 82-kilometre corridor, named the Namo Bharat corridor, is being developed by the National Capital Region Transport Corporation (NCRTC) as a high-speed regional connectivity initiative. Out of the total length, a 55-kilometre stretch with 11 stations is already operational, while work on the remaining 27-kilometre portion is advancing rapidly. Additionally, construction on a two-kilometre extension from Sarai Kale Khan to Jangpura is still ongoing.

Since services began on the 17-kilometre priority section on October 21, 2023, the corridor has gradually extended its reach. In Delhi, the segment between Sahibabad and New Ashok Nagar was inaugurated on January 5. The Namo Bharat trains have already served over one crore commuters.

To enhance last-mile connectivity, NCRTC has partnered with the Delhi Transport Corporation (DTC) and other mobility service providers. Some operators also offer discounts to Namo Bharat commuters.

The fare for traveling on the Namo Bharat train from New Ashok Nagar (Delhi) to Meerut South is Rs 150 for standard class and Rs 225 for premium class, while the fare from Anand Vihar to Meerut South is Rs 130 for standard and Rs 195 for premium class.

Trial runs are underway on two important remaining stretches: a 4.5-kilometre elevated segment between Sarai Kale Khan and New Ashok Nagar in Delhi, and a 23-kilometre section between Meerut South and Modipuram in Meerut. Trains have been seen running the full length of the corridor as part of ongoing operational testing.

The Sarai Kale Khan station, the corridor鈥檚 originating point in Delhi, is almost ready. It is equipped with 12 escalators, four lifts, and Platform Screen Doors (PSDs). Five entry-exit points have been constructed, and the related infrastructure is prepared for operations.

In Meerut, the final leg of the corridor includes three additional stations: Shatabdi Nagar, Begumpul, and Modipuram. Shatabdi Nagar is an elevated station where tracks, platform screen doors, and other systems have been installed. Begumpul, an underground station located in the heart of Meerut鈥檚 market area, will serve both Namo Bharat trains and local metro services, with work nearly complete. Modipuram, the last station on the corridor, is situated along the national highway and will feature a Foot Over Bridge (FOB) for safe pedestrian access.

Trial runs have also started on the Meerut Metro, a 23-kilometre local service operating on the same infrastructure as the Namo Bharat trains. This development marks the first time in India that metro and regional services will share a common corridor. The Meerut Metro line includes 13 stations, of which three are underground.

News source: The Week

By the end of June, travel time from Sarai Kale Khan in Delhi to Modipuram in Uttar Pradesh鈥檚 Meerut is expected to be just 45 minutes, as the final phase of India鈥檚 first Regional Rapid Transit System (RRTS) corridor nears completion, according to officials.The 82-kilometre corridor, named the Namo Bharat corridor, is being developed by the National Capital Region Transport Corporation (NCRTC) as a high-speed regional connectivity initiative. Out of the total length, a 55-kilometre stretch with 11 stations is already operational, while work on the remaining 27-kilometre portion is advancing rapidly. Additionally, construction on a two-kilometre extension from Sarai Kale Khan to Jangpura is still ongoing.Since services began on the 17-kilometre priority section on October 21, 2023, the corridor has gradually extended its reach. In Delhi, the segment between Sahibabad and New Ashok Nagar was inaugurated on January 5. The Namo Bharat trains have already served over one crore commuters.To enhance last-mile connectivity, NCRTC has partnered with the Delhi Transport Corporation (DTC) and other mobility service providers. Some operators also offer discounts to Namo Bharat commuters.The fare for traveling on the Namo Bharat train from New Ashok Nagar (Delhi) to Meerut South is Rs 150 for standard class and Rs 225 for premium class, while the fare from Anand Vihar to Meerut South is Rs 130 for standard and Rs 195 for premium class.Trial runs are underway on two important remaining stretches: a 4.5-kilometre elevated segment between Sarai Kale Khan and New Ashok Nagar in Delhi, and a 23-kilometre section between Meerut South and Modipuram in Meerut. Trains have been seen running the full length of the corridor as part of ongoing operational testing.The Sarai Kale Khan station, the corridor鈥檚 originating point in Delhi, is almost ready. It is equipped with 12 escalators, four lifts, and Platform Screen Doors (PSDs). Five entry-exit points have been constructed, and the related infrastructure is prepared for operations.In Meerut, the final leg of the corridor includes three additional stations: Shatabdi Nagar, Begumpul, and Modipuram. Shatabdi Nagar is an elevated station where tracks, platform screen doors, and other systems have been installed. Begumpul, an underground station located in the heart of Meerut鈥檚 market area, will serve both Namo Bharat trains and local metro services, with work nearly complete. Modipuram, the last station on the corridor, is situated along the national highway and will feature a Foot Over Bridge (FOB) for safe pedestrian access.Trial runs have also started on the Meerut Metro, a 23-kilometre local service operating on the same infrastructure as the Namo Bharat trains. This development marks the first time in India that metro and regional services will share a common corridor. The Meerut Metro line includes 13 stations, of which three are underground.News source: The Week

Next Story
Infrastructure Urban

Reliance, Diehl Advance Pact for Precision-Guided Munitions

Diehl Defence CEO Helmut Rauch and Reliance Group鈥檚 Founder Chairman Anil D. Ambani have held discussions to advance their ongoing strategic partnership focused on Guided and Terminally Guided Munitions (TGM), under a cooperation agreement originally signed in 2019.This collaboration underscores Diehl Defence鈥檚 long-term commitment to the Indian market and its support for the Indian Government鈥檚 Make in India initiative. The partnership鈥檚 current emphasis is on the urgent supply of the Vulcano 155mm Precision Guided Munition system to the Indian Armed Forces.Simultaneously, the 鈥淰ulc..

Next Story
Infrastructure Urban

Modis Navnirman to Migrate to Main Board, Merge Subsidiary

Modis Navnirman Limited has announced that its Board of Directors has approved a key strategic initiative involving migration from the BSE SME platform to the Main Board of both BSE and NSE, alongside a merger with its wholly owned subsidiary, Shree Modis Navnirman Private Limited.The move to the main boards marks a major milestone in the company鈥檚 growth trajectory, reflecting its consistent financial performance, robust corporate governance, and long-term commitment to value creation. This transition will grant the company access to a broader investor base, improve market participation, en..

Next Story
Infrastructure Urban

Global Capital Flows Remain Subdued, EMEA Leads in Q1 2025

The Bharat InvITs Association鈥檚 industry update for Q1 2025 shows subdued global capital flows, with investment volumes remaining at the lower end of the five-year range despite a late 2024 recovery. According to data from Colliers and MSCI Real Capital Analytics, activity in North America declined slightly, while EMEA maintained steady levels and emerged as the top region for investment in standing assets.The EMEA region now hosts seven of the top ten cross-border capital destinations for standing assets, pushing the United States鈥� share of global activity below 15 per cent. Meanwhile, in..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement