Railway Board plans to improve various rail routes to 160 kmph
30 Nov 2021
2 Min Read
CW Team
The Railway Board has directed all the zones across the Indian Railways to make detailed project reports (DPRs) for improving various routes to 160 kmph.
The zones have been directed to present the DPRs in two months.
In a circular released on November 3 to all general managers, the Railway Board has in-principle permitted to enhance the speed of trains to 160 kmph. In 2017, when Suresh Prabhu was the railway minister, the decision was taken. Excluding a few routes, it was not executed.
The DPRs must have been asked to cover these projects in the general budget the following year. The eight routes with 9,268 km length across the nation additionally cover 2,164 km Delhi-Chennai and 1,965 km Mumbai-Howrah routes passing via Maharashtra.
North Central Railway (NCR) and South East Central Railway (SECR) have been urged to make the DPR for Delhi-Chennai and Mumbai-Howrah routes, respectively. Once in place, the travel time of trains on these sections will be decreased drastically.
The 160 kmph enhancement on the Mumbai-Delhi and Delhi-Howrah routes was approved in 2017-18. The work is undertaken and is likely to be done between 2023-2024.
Over the last three years, maximum speeds on various sections of the Golden Quadrilateral and the Golden Diagonal were upgraded to 130 kmph from the previous 110 kmph.
SECR鈥檚 senior divisional commercial manager (SrDCM), Vikas Kumar Kashyap, told the media that the SECR enhanced its tracks to run express or mail trains at 130kmph between Nagpur-Durg.
As per Kashyap, these works involved gradients, curves realignment, strengthening of tracks, adjustment of overhead electric lines (OHEs), rail panels, maintenance, elimination of all unmanned railway crossings etc.
The SrDCM said to enhance the tracks after the engineering department will make a DPR with say from other departments such as commercial and signalling.
Central Railway spokesperson & ACM Vijay Thool told the media that Central Railway is yet to enhance its tracks to run trains at 130 kmph. The express or mail trains move at 110 kmph while Rajdhanis run at 120kmph. Trials for 130 kmph are underway.
The Railway Board has directed all the zones across the Indian Railways to make detailed project reports (DPRs) for improving various routes to 160 kmph.
The zones have been directed to present the DPRs in two months.
In a circular released on November 3 to all general managers, the Railway Board has in-principle permitted to enhance the speed of trains to 160 kmph. In 2017, when Suresh Prabhu was the railway minister, the decision was taken. Excluding a few routes, it was not executed.
The DPRs must have been asked to cover these projects in the general budget the following year. The eight routes with 9,268 km length across the nation additionally cover 2,164 km Delhi-Chennai and 1,965 km Mumbai-Howrah routes passing via Maharashtra.
North Central Railway (NCR) and South East Central Railway (SECR) have been urged to make the DPR for Delhi-Chennai and Mumbai-Howrah routes, respectively. Once in place, the travel time of trains on these sections will be decreased drastically.
The 160 kmph enhancement on the Mumbai-Delhi and Delhi-Howrah routes was approved in 2017-18. The work is undertaken and is likely to be done between 2023-2024.
Over the last three years, maximum speeds on various sections of the Golden Quadrilateral and the Golden Diagonal were upgraded to 130 kmph from the previous 110 kmph.
SECR鈥檚 senior divisional commercial manager (SrDCM), Vikas Kumar Kashyap, told the media that the SECR enhanced its tracks to run express or mail trains at 130kmph between Nagpur-Durg.
As per Kashyap, these works involved gradients, curves realignment, strengthening of tracks, adjustment of overhead electric lines (OHEs), rail panels, maintenance, elimination of all unmanned railway crossings etc.
The SrDCM said to enhance the tracks after the engineering department will make a DPR with say from other departments such as commercial and signalling.
Central Railway spokesperson & ACM Vijay Thool told the media that Central Railway is yet to enhance its tracks to run trains at 130 kmph. The express or mail trains move at 110 kmph while Rajdhanis run at 120kmph. Trials for 130 kmph are underway.
Image Source
Next Story
MoHUA Plans New Role for Smart City SPVs
In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..
Next Story
ADB Approves $110 Million Loan to Boost Skills in Gujarat
The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..
Next Story
SDAL Tests Rudrastra UAV and Bhargavastra Defence System
Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..