亚博体育官网首页

BMC Speeds Up Waste-to-Energy Plant After Delays
WATER & WASTE

BMC Speeds Up Waste-to-Energy Plant After Delays

After facing criticism over delays, the Brihanmumbai Municipal Corporation (BMC) has accelerated efforts to commission the long-awaited waste-to-energy (WTE) plant at Deonar by October 2025. The civic body has also revised its original plan, increasing the plant鈥檚 power generation capacity from 4 MW to 7 MW. The facility will process 600 metric tonnes (MT) of waste daily while generating sustainable energy.

Mumbai produces around 6,300 MT of waste per day, with 10% still being dumped at the Deonar landfill, which spans 311 acres and has been in use since 1927. The BMC has requested the Revenue Department鈥檚 chief secretary to allocate part of the landfill for its use, while the rest will be reserved for the Dharavi Redevelopment Project.

The WTE plant is a critical step toward addressing the nearly 20 million MT of waste accumulated at Deonar. However, the project has faced setbacks, including a failed attempt to attract bidders for processing 3,000 MT of waste per day. After nearly six years of delays, construction finally began in June 2022.

M/s Chennai MSW Pvt Ltd was awarded the Rs 6.48 billion contract, which includes a 40-month design and build phase and a 15-year operation and maintenance period. The project was criticized in a special audit report by the Comptroller and Auditor General (CAG) for BMC鈥檚 lack of monitoring and prolonged delays in obtaining necessary approvals.

After facing criticism over delays, the Brihanmumbai Municipal Corporation (BMC) has accelerated efforts to commission the long-awaited waste-to-energy (WTE) plant at Deonar by October 2025. The civic body has also revised its original plan, increasing the plant鈥檚 power generation capacity from 4 MW to 7 MW. The facility will process 600 metric tonnes (MT) of waste daily while generating sustainable energy. Mumbai produces around 6,300 MT of waste per day, with 10% still being dumped at the Deonar landfill, which spans 311 acres and has been in use since 1927. The BMC has requested the Revenue Department鈥檚 chief secretary to allocate part of the landfill for its use, while the rest will be reserved for the Dharavi Redevelopment Project. The WTE plant is a critical step toward addressing the nearly 20 million MT of waste accumulated at Deonar. However, the project has faced setbacks, including a failed attempt to attract bidders for processing 3,000 MT of waste per day. After nearly six years of delays, construction finally began in June 2022. M/s Chennai MSW Pvt Ltd was awarded the Rs 6.48 billion contract, which includes a 40-month design and build phase and a 15-year operation and maintenance period. The project was criticized in a special audit report by the Comptroller and Auditor General (CAG) for BMC鈥檚 lack of monitoring and prolonged delays in obtaining necessary approvals.

Next Story
Resources

RentenPe and Mygate Partner to Transform Rent Payments in India

Through a strategic partnership, RentenPe and Mygate aim to streamline rent payments and promote financial inclusion by enabling rent-based credit scores for Indian renters. RentenPe, India鈥檚 first Rent Credit Score鈩� platform and a pioneer in rental fintech innovation, has entered a significant alliance with Mygate, the leading community management app in the country. This partnership will transform rent transactions for millions of Indian households by embedding RentenPe鈥檚 payment and rent credit scoring technology directly within the Mygate app. With this integration, all ren..

Next Story
Real Estate

Supreme Unveils New Brand Identity to Elevate Lifestyle

Supreme, a respected name in Indian real estate with a four-decade legacy, has announced a complete rebranding. The move includes the launch of a new logo and a revamped website, both reflecting the group鈥檚 refreshed vision to 鈥楨levate Lifestyle鈥�. This brand transformation represents more than a visual refresh鈥攊t marks a strategic shift in the company鈥檚 mission, visual identity and market positioning. The update will be visible across all of Supreme鈥檚 digital, social and offline communication platforms. At the core of the initiative is a renewed focus on purposeful design..

Next Story
Infrastructure Urban

Capri Loans Launches #TarrakiKeHaath Campaign Honouring India鈥檚 Everyday Heroes

Capri Global Capital Ltd (Capri Loans), a leading non-banking financial company, has unveiled its latest brand campaign, #TarrakiKeHaath, a powerful tribute to the everyday hands that build India 鈥� from kirana store owners and taxi drivers to dhaba workers, tailors, and carpenters. Narrated by Capri Loans鈥� long-standing brand ambassador and acclaimed actor Pankaj Tripathi, the campaign celebrates the dignity, resilience, and aspirations of self-employed individuals and small business owners who form the backbone of Bharat鈥檚 economy. Conceptualized by Rediffusion Brand Solutions, the..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement