ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

Karnataka targets 43.33% renewable energy by 2030
POWER & RENEWABLE ENERGY

Karnataka targets 43.33% renewable energy by 2030

The Karnataka Electricity Regulatory Commission (KERC) has proposed ambitious new targets to achieve 43.33% of Karnataka’s energy consumption from renewable sources by 2029-30. The draft notification, currently open for stakeholder comments until November 27, 2024, outlines a phased increase in Renewable Purchase Obligations (RPO) for distribution licensees, captive consumers, and open access consumers.

Starting with a 29.91% target for 2024-25, the RPO plan includes specific sub-targets for wind, hydro, distributed, and other renewables. Distribution licensees must source a minimum share of their energy from non-fossil sources, with compliance requirements varying by category. The plan also stipulates that cooperative entities like Hukkeri Rural Electric Co-operative Society and other deemed licensees comply via their electricity suppliers if the supplier meets RPO targets. If the suppliers fall short, the cooperative is responsible for meeting the RPO itself.

For captive and open access consumers, the regulation mandates sourcing part of their power from renewable sources. Those with multiple units in Karnataka under one legal entity can meet the RPO collectively across all units.

These measures align with India’s national goals for non-fossil energy consumption, aiming to accelerate Karnataka's transition to clean energy. KERC has recently introduced additional regulations, including peer-to-peer solar energy transactions and balancing generation with consumption to reduce deviations. If approved, the proposal will reinforce Karnataka's position as a leader in renewable energy.

(Mercom)

The Karnataka Electricity Regulatory Commission (KERC) has proposed ambitious new targets to achieve 43.33% of Karnataka’s energy consumption from renewable sources by 2029-30. The draft notification, currently open for stakeholder comments until November 27, 2024, outlines a phased increase in Renewable Purchase Obligations (RPO) for distribution licensees, captive consumers, and open access consumers. Starting with a 29.91% target for 2024-25, the RPO plan includes specific sub-targets for wind, hydro, distributed, and other renewables. Distribution licensees must source a minimum share of their energy from non-fossil sources, with compliance requirements varying by category. The plan also stipulates that cooperative entities like Hukkeri Rural Electric Co-operative Society and other deemed licensees comply via their electricity suppliers if the supplier meets RPO targets. If the suppliers fall short, the cooperative is responsible for meeting the RPO itself. For captive and open access consumers, the regulation mandates sourcing part of their power from renewable sources. Those with multiple units in Karnataka under one legal entity can meet the RPO collectively across all units. These measures align with India’s national goals for non-fossil energy consumption, aiming to accelerate Karnataka's transition to clean energy. KERC has recently introduced additional regulations, including peer-to-peer solar energy transactions and balancing generation with consumption to reduce deviations. If approved, the proposal will reinforce Karnataka's position as a leader in renewable energy. (Mercom)

Next Story
Infrastructure Transport

Mumbai Road Project Misses Target With Just 49% Work Done

Mumbai’s ambitious road concretisation project, launched to transform the city's roads into pothole-free corridors, has achieved only 49.07 per cent completion as of 31 May 2024, leaving half the proposed work still unfinished.The project, directed by then-Chief Minister Eknath Shinde in July 2022, aimed to concretise all roads in Mumbai within two years. The Brihanmumbai Municipal Corporation (BMC) planned a total of 2,121 roadworks across Phase 1 and Phase 2, covering a combined length of 698.44 kilometres.By the May 2024 deadline, 1,385 roads totalling 342.74 kilometres had been completed..

Next Story
Infrastructure Energy

Evolve Energy Wins Puducherry 5 MW Rooftop Solar Project

Chennai-based Evolve Energy has secured a contract to implement a 5 MW rooftop solar project across various government buildings in Puducherry, following a tender by the Pondicherry Electricity Board (PEB) and facilitated by the Solar Energy Corporation of India (SECI).The project involves deploying rooftop solar systems across key public infrastructure, including secretariats, hospitals, courts, educational institutions, and administrative offices. With site-specific customisation, Evolve Energy aims to ensure smooth integration with minimal operational disruption.As the end-to-end engineerin..

Next Story
Infrastructure Energy

BPCL Awards Volks Energie Solar-Battery Project for IDPL

Bharat Petroleum Corporation Limited (BPCL) has awarded Volks Energie a contract to commission a solar photovoltaic and lithium-ion battery system for the Irugur–Devangonthi Pipeline (IDPL) Project, a vital petroleum product infrastructure initiative spanning Tamil Nadu and Karnataka.This marks the second collaboration between BPCL and Volks Energie, following a previous project in Telangana and Andhra Pradesh. The current scope involves setting up off-grid renewable power systems at key control stations and remote locations along the IDPL corridor, which stretches from Irugur near Coimbator..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement