Built to perfection

The new Nivea plant in Gujarat, with its accurate design specifications, has been built to perfection.

Beiersdorf AG, parent company of Nivea and one of the world´s leading international skin care companies, has over 130 years of experience in skin care. The company, with one of the world´s most modern skin research centres, offers innovative and high-quality cosmetic products. It wanted to set up its first manufacturing plant in India for a range of creams and lotions at Gujarat Industrial Development Corporation at Sanand. Nivea awarded the contract for design, manufacture, supply and erection of the 10,397 sq m industrial building to Tata BlueScope Building Solutions with performance-based bonus. The project, scheduled in the monsoon season, was to be completed in mutually agreed time frame.

Key project requirements
The major requirements of the projects included

  • 10 years leak-proof warranty.
  • 48.0 clear span to facilitate process requirements.
  • On-time project completion without compromising quality, safety and leak-proof performance.

Challenges
The project faced several challenges such as:

  • Ensuring a long term leak-proof roof performance with 80 number of openings in the roof for fixing of turbo vents and with skylights in 4 per cent of the total area.
  • Completion of the project in mutually agreed schedule during the monsoon season.

Leak-proof Roof System
Considering all the project requirements, the project team proposed a BUTLER® Building System with MR-24® Roof system - the best leakproof solution available for critical industrial applications.

Side Laps

  • Involves 3600 double lock seaming of side lap. 180 degree is seamed at site by Roof Runner® to achieve a greater leak-proof assurance.
  • Pre-punched purlins for fixing of roof clips helps in better alignment of side laps, faster installation and superior aesthetics.

Roof Clip

  • 32.5 mm clip movement of in both directions abolishes roof expansion joint till 250 ft of panel length.
  • Centering arrangement in Roof Clip ensures thermal movement in both directions.
  • Triangular bar with thin cadmium coating in clip assembly helps in reducing friction and provides greater sensitivity to thermal movement.

End Lap Design

  • Pre-punched panels ensures tighter and neater end laps.
  • Splice position exactly above purlin ensures that the joint does not weaken due to foot traffic.
  • Only two MR-24® panels are joined at end laps and staggered end lap splices helps in reducing chances of leakages.

Roof Curbs

  • Internal flange design of curb conceals fasteners with curb that helps in eliminating the possibility of leaks.
  • Diverter flashings at Roof Curbs prevents ponding on the high side of the roof curbs.
  • Curbs are secured to roof sheet and not to purlins, this ensures uninhibited thermal movement of entire roof system.

(Communication by the management of the company)

The new Nivea plant in Gujarat, with its accurate design specifications, has been built to perfection. Beiersdorf AG, parent company of Nivea and one of the world´s leading international skin care companies, has over 130 years of experience in skin care. The company, with one of the world´s most modern skin research centres, offers innovative and high-quality cosmetic products. It wanted to set up its first manufacturing plant in India for a range of creams and lotions at Gujarat Industrial Development Corporation at Sanand. Nivea awarded the contract for design, manufacture, supply and erection of the 10,397 sq m industrial building to Tata BlueScope Building Solutions with performance-based bonus. The project, scheduled in the monsoon season, was to be completed in mutually agreed time frame. Key project requirements The major requirements of the projects included 10 years leak-proof warranty. 48.0 clear span to facilitate process requirements. On-time project completion without compromising quality, safety and leak-proof performance. Challenges The project faced several challenges such as: Ensuring a long term leak-proof roof performance with 80 number of openings in the roof for fixing of turbo vents and with skylights in 4 per cent of the total area. Completion of the project in mutually agreed schedule during the monsoon season. Leak-proof Roof System Considering all the project requirements, the project team proposed a BUTLER® Building System with MR-24® Roof system - the best leakproof solution available for critical industrial applications. Side Laps Involves 3600 double lock seaming of side lap. 180 degree is seamed at site by Roof Runner® to achieve a greater leak-proof assurance. Pre-punched purlins for fixing of roof clips helps in better alignment of side laps, faster installation and superior aesthetics. Roof Clip 32.5 mm clip movement of in both directions abolishes roof expansion joint till 250 ft of panel length. Centering arrangement in Roof Clip ensures thermal movement in both directions. Triangular bar with thin cadmium coating in clip assembly helps in reducing friction and provides greater sensitivity to thermal movement. End Lap Design Pre-punched panels ensures tighter and neater end laps. Splice position exactly above purlin ensures that the joint does not weaken due to foot traffic. Only two MR-24® panels are joined at end laps and staggered end lap splices helps in reducing chances of leakages. Roof Curbs Internal flange design of curb conceals fasteners with curb that helps in eliminating the possibility of leaks. Diverter flashings at Roof Curbs prevents ponding on the high side of the roof curbs. Curbs are secured to roof sheet and not to purlins, this ensures uninhibited thermal movement of entire roof system. (Communication by the management of the company)

Next Story
Resources

RentenPe and Mygate Partner to Transform Rent Payments in India

Through a strategic partnership, RentenPe and Mygate aim to streamline rent payments and promote financial inclusion by enabling rent-based credit scores for Indian renters. RentenPe, India’s first Rent Credit Scoreâ„� platform and a pioneer in rental fintech innovation, has entered a significant alliance with Mygate, the leading community management app in the country. This partnership will transform rent transactions for millions of Indian households by embedding RentenPe’s payment and rent credit scoring technology directly within the Mygate app. With this integration, all ren..

Next Story
Real Estate

Supreme Unveils New Brand Identity to Elevate Lifestyle

Supreme, a respected name in Indian real estate with a four-decade legacy, has announced a complete rebranding. The move includes the launch of a new logo and a revamped website, both reflecting the group’s refreshed vision to ‘Elevate Lifestyleâ€�. This brand transformation represents more than a visual refresh—it marks a strategic shift in the company’s mission, visual identity and market positioning. The update will be visible across all of Supreme’s digital, social and offline communication platforms. At the core of the initiative is a renewed focus on purposeful design..

Next Story
Infrastructure Urban

Capri Loans Launches #TarrakiKeHaath Campaign Honouring India’s Everyday Heroes

Capri Global Capital Ltd (Capri Loans), a leading non-banking financial company, has unveiled its latest brand campaign, #TarrakiKeHaath, a powerful tribute to the everyday hands that build India â€� from kirana store owners and taxi drivers to dhaba workers, tailors, and carpenters. Narrated by Capri Loansâ€� long-standing brand ambassador and acclaimed actor Pankaj Tripathi, the campaign celebrates the dignity, resilience, and aspirations of self-employed individuals and small business owners who form the backbone of Bharat’s economy. Conceptualized by Rediffusion Brand Solutions, the..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement