亚博体育官网首页

Indian highways will be on par with US by 2024
ROADS & HIGHWAYS

Indian highways will be on par with US by 2024

According to Nitin Gadkari, Union Minister for Road Transport and Highways, India's highway infrastructure would be on par with that of the US by 2024 thanks to work being done in a time-bound "mission mode" that includes building green motorways and rail over bridges.

He claimed that "Bharatmala 2" will likely receive cabinet approval soon and, whenever it does, will be in compliance with the needs of a reliable infrastructure for the nation.

Railway overpasses are being built this year at a cost of Rs 160 billion, which will rise to Rs 500 billion in five years, according to the Minister of Road Transport and Highways.

Gadkari stated that "93% construction on the Kailash Mansarovar project has been finished" in reference to the Kailash Mansarovar motorway via Pithoragarh.

The journey time will be shortened by many days once this project is finished, allowing pilgrims on the Kailash Mansarovar Yatra to skip the challenging trek across dangerous high-altitude terrain.

Currently, travelling to Kailash Mansarovar via Sikkim or Nepal takes two to three weeks.

Also read:
A Safer Road to Maintenance with bitumen emulsions
Gorakhpur Link Expressway to be operational soon


According to Nitin Gadkari, Union Minister for Road Transport and Highways, India's highway infrastructure would be on par with that of the US by 2024 thanks to work being done in a time-bound mission mode that includes building green motorways and rail over bridges. He claimed that Bharatmala 2 will likely receive cabinet approval soon and, whenever it does, will be in compliance with the needs of a reliable infrastructure for the nation. Railway overpasses are being built this year at a cost of Rs 160 billion, which will rise to Rs 500 billion in five years, according to the Minister of Road Transport and Highways. Gadkari stated that 93% construction on the Kailash Mansarovar project has been finished in reference to the Kailash Mansarovar motorway via Pithoragarh. The journey time will be shortened by many days once this project is finished, allowing pilgrims on the Kailash Mansarovar Yatra to skip the challenging trek across dangerous high-altitude terrain. Currently, travelling to Kailash Mansarovar via Sikkim or Nepal takes two to three weeks. Also read: A Safer Road to Maintenance with bitumen emulsionsGorakhpur Link Expressway to be operational soon

Next Story
Infrastructure Urban

MoHUA Plans New Role for Smart City SPVs

In a significant policy move, the Ministry of Housing and Urban Affairs (MoHUA) has issued an advisory encouraging the continued use and repurposing of Special Purpose Vehicles (SPVs) formed under the Smart Cities Mission (SCM). This marks a step toward sustaining urban transformation by leveraging institutional capabilities and infrastructure developed over the past decade.Initiated in 2015, the Smart Cities Mission introduced a new era of urban planning in India, with each of the 100 selected cities forming SPVs under the Companies Act, 2013. These entities, jointly owned by state government..

Next Story
Infrastructure Urban

ADB Approves $110 Million Loan to Boost Skills in Gujarat

The Asian Development Bank (ADB) has approved a USD 109.97 million (Rs 9.27 billion) results-based loan to support Gujarat鈥檚 efforts to become a global industrial hub by developing a future-ready, skilled workforce.The funding will back the Gujarat skills development programme, led by the Department of Labour, Skill Development and Employment in collaboration with Kaushalya: The Skill University (KSU). The initiative aims to equip the workforce with advanced, industry-aligned skills to meet rising employment demand in high-growth sectors.According to ADB, the programme seeks to strengthen in..

Next Story
Infrastructure Urban

SDAL Tests Rudrastra UAV and Bhargavastra Defence System

Solar Defence and Aerospace Limited (SDAL) has successfully completed a key flight test of its indigenous Hybrid VTOL UAV Rudrastra at the Pokharan Firing Range, aligning with Indian Army performance benchmarks for mission adaptability, high endurance, precision engagement, and vertical take-off and landing (VTOL) capability.The trial marks a notable achievement in India鈥檚 Aatmanirbhar Bharat initiative, underscoring advancements in home-grown military technology. The Rudrastra UAV demonstrated a mission radius exceeding 50 km with uninterrupted video relay, a total operational range of over..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement