Jalandhar adds 380 tonnes to legacy waste daily; NGT demands plan
30 Aug 2024
2 Min Read
CW Team
The National Green Tribunal (NGT) has expressed serious concern over the addition of 380 tonnes of solid waste to Jalandhar's legacy waste each day. In response, the NGT has ordered the city's municipal corporation (MC) commissioner to submit an affidavit within four weeks, outlining a time-bound action plan to achieve zero waste generation and remediate existing legacy waste.
The NGT bench, led by Chairman Justice Prakash Shrivastva, emphasised that the affidavit must also detail the steps taken so far and identify the sources of funding required to meet these targets.
The order came during the hearing of an application filed by Varinder Malik and Tajasvi Minhas. The NGT noted that Jalandhar MC's additional commissioner, representing the MC commissioner, reported that 500 tonnes per day (TPD) of solid waste is generated within the city?s municipal limits, of which only 120 TPD is currently being treated. This leaves 380 TPD contributing to the legacy waste daily, with much of it being transported to the Waryana dump site near the city.
The bench also acknowledged grievances raised in the original applications regarding an illegal garbage dump behind Kewal Vihar, opposite the cremation ground in Model Town, Jalandhar. The applicants alleged that unsegregated mixed solid waste was being dumped at the site, posing a significant health hazard.
A report from the Punjab Pollution Control Board (PPCB), cited by the NGT, confirmed the applicant's concerns about unsegregated waste dumping in Model Town. The report also noted that the MC had failed to provide bins or compactors at the site.
Furthermore, the PPCB report revealed that an environmental compensation (EC) of Rs 45 million had been imposed on the MC for violating the Solid Waste Management Rules, 2016. The PPCB also directed the MC to submit a fresh bank guarantee of Rs 2.5 million within 15 days as an assurance to comply with the rules.
The PPCB stated that it would prepare and present the matter for imposing EC as per the NGT methodology by July 31, 2024, within seven days. The MC was also ordered to submit the remaining compensation of Rs 36 million, previously imposed up to March 31, along with the EC till July 31, within 15 days. The NGT further noted that the board has the authority to initiate legal proceedings against the MC and responsible officers if the rules are not followed.
(TOI)
The National Green Tribunal (NGT) has expressed serious concern over the addition of 380 tonnes of solid waste to Jalandhar's legacy waste each day. In response, the NGT has ordered the city's municipal corporation (MC) commissioner to submit an affidavit within four weeks, outlining a time-bound action plan to achieve zero waste generation and remediate existing legacy waste.
The NGT bench, led by Chairman Justice Prakash Shrivastva, emphasised that the affidavit must also detail the steps taken so far and identify the sources of funding required to meet these targets.
The order came during the hearing of an application filed by Varinder Malik and Tajasvi Minhas. The NGT noted that Jalandhar MC's additional commissioner, representing the MC commissioner, reported that 500 tonnes per day (TPD) of solid waste is generated within the city?s municipal limits, of which only 120 TPD is currently being treated. This leaves 380 TPD contributing to the legacy waste daily, with much of it being transported to the Waryana dump site near the city.
The bench also acknowledged grievances raised in the original applications regarding an illegal garbage dump behind Kewal Vihar, opposite the cremation ground in Model Town, Jalandhar. The applicants alleged that unsegregated mixed solid waste was being dumped at the site, posing a significant health hazard.
A report from the Punjab Pollution Control Board (PPCB), cited by the NGT, confirmed the applicant's concerns about unsegregated waste dumping in Model Town. The report also noted that the MC had failed to provide bins or compactors at the site.
Furthermore, the PPCB report revealed that an environmental compensation (EC) of Rs 45 million had been imposed on the MC for violating the Solid Waste Management Rules, 2016. The PPCB also directed the MC to submit a fresh bank guarantee of Rs 2.5 million within 15 days as an assurance to comply with the rules.
The PPCB stated that it would prepare and present the matter for imposing EC as per the NGT methodology by July 31, 2024, within seven days. The MC was also ordered to submit the remaining compensation of Rs 36 million, previously imposed up to March 31, along with the EC till July 31, within 15 days. The NGT further noted that the board has the authority to initiate legal proceedings against the MC and responsible officers if the rules are not followed.
(TOI)
Next Story
Swamiraj Rebrands as House of Swamiraj, Announces Rs 210 Cr Project
In a strategic shift marking its evolution from a reputed builder to a lifestyle-focused brand, Swamiraj Constructions has rebranded as House of Swamiraj. With a two-decade legacy and over 1,700 homes delivered across the Mumbai Metropolitan Region (MMR), the company is embracing a new phase centred on community-driven, wellness-oriented living. The rebranding was unveiled via a digital campaign titled #BeyondDimensions, executed in three phases鈥攖easer, engagement, and launch. The campaign spotlighted the brand鈥檚 renewed commitment to designing homes that go beyond function to foster ..
Next Story
Morpho Dimensions Set to Cross Rs 1 billion Revenue in FY 25鈥�26
Morpho Dimensions, a venture of acclaimed architecture and design firm Morphogenesis, is transforming India鈥檚 office interiors landscape with a technology-first, design-led approach. With a secured orderbook of Rs 700 million and additional projects in the pipeline, the firm is confidently on track to cross Rs 1 billion in revenue in FY 2025鈥�26.聽By combining Artificial Intelligence (AI), Building Information Modelling (BIM), and Virtual Reality (VR), Morpho Dimensions enables clients to visualise and step into immersive, ready-to-operate workspaces within 90 days鈥攗shering in a new bench..
Next Story
TOTO鈥檚 NEOREST Surpasses 4 Million Global Shipments
TOTO has announced that its flagship smart toilet, NEOREST, has surpassed 4 million global shipments as of March 2025, marking a major milestone in the evolution of luxury sanitation and setting a new global benchmark in design-led hygiene innovation. Launched in 1993 with the aim to redefine conventional toilets, NEOREST has consistently merged cutting-edge technology with minimalist design. Over three decades, it has become a category-defining product, earning global acclaim with prestigious honours including the iF Design Award, Red Dot, and Green Good Design Awards. The integrate..